Field           ENGINEERING AND TECHNOLOGY

 

Review of Infrastructure Works Utilities unit standards

 

Subfield

Domain

ID

Infrastructure Works

Infrastructure Works Utilities

20480, 20485, 25396

 

The Connexis Infrastructure ITO has completed the review of the unit standards listed above.

 

Date new versions published                                                               November 2018

 

Planned review date                                                                              December 2023

 

Summary

 

These unit standards were reviewed as part of a comprehensive review of qualifications, programmes, and unit standards relating to the civil sector of the infrastructure industry.  The standards were reviewed in groups according to the programmes for which they are intended.

 

The review took place between March 2017 and July 2018 and involved Working Groups from the Pipelines and Trenchless Technologies sectors of the industry.  Working Group meetings were held in June, September, and October 2017, February 2018, and August 2018, and drafts were circulated among the working group and a wider industry consultation group in August 2018. 

 

Main changes

 

·      Standard 20485 was increased by 5 credits to align with the credit values of other unit standards covering skills and knowledge in horizontal directional drilling plant operation.

·      Standard 20480 was designated expiring.

·      Six new standards were developed to cover the required skills for trenchless pipe installation and rehabilitation at Level 4.

 

The Category D unit standard will expire at the end of December 2021

 

The last date for assessment of superseded versions of Category B unit standards is December 2021

 

Detailed list of unit standards – classification, title, level, and credits

 

All changes are in bold. The details of recommended alternative unit standards are in italics.

 

Engineering and Technology > Infrastructure Works > Infrastructure Works Utilities

ID

Title

Level

Credit

Review Category

20480

 

31573

Prepare for horizontal directional drilling operations and disestablish the site afterwards

Set up site and equipment for trenchless pipe installation or rehabilitation and disestablish the site afterwards

4

 

4

6

 

10

D

 

New

20485

Provide tracking for horizontal directional drilling

4

15

20

B

25396

Demonstrate knowledge of damage avoidance, consequences of damage, and damage response for trenchless installations

4

4

B

31570

Plan trenchless pipe installation or rehabilitation

4

20

New

31571

Manage pipe handling, preparation, and assembly for trenchless installation

4

20

New

31572

Demonstrate knowledge of the effects of soil types and ground conditions on trenchless operations

4

6

New

31574

Install pipes using trenchless methodology

4

20

New

31575

Rehabilitiate pipes using trenchless methodology

4

20

New