FIELD ENGINEERING AND TECHNOLOGY
Review of Electricity Supply - Live Work unit standards
|
Subfield |
Domain |
Id |
|
Electricity Supply |
Electricity Supply - Live Work |
10531, 10535-10538, 10540-10542 |
The Electricity Supply Industry Training Organisation (ESITO) has completed the review of the unit standards listed above.
Date new versions published September 2009
Planned review date December 2014
Summary of review and consultation process
These unit standards have been reviewed to ensure that they remain relevant to industry. As part of the review process an industry consultation round took place. Representatives from all sectors of the electricity supply industry were contacted and invited to provide input, and all accredited organisations were also asked for their comments. The feedback gathered during the consultation round informed the review of these standards.
Main changes resulting from the review
· Special notes updated.
· Range statements updated.
· Titles of standards 10531, 10535, 10537, and 10540 were updated.
Impact on existing qualifications
Qualifications that contain the reviewed standards or classifications are tabled below.
|
Affected |
The qualification lists a reviewed classification (domain or subfield) in an elective set The qualification lists a standard that has changes to level or credits The qualification lists a C or D category standard |
|
Not materially affected |
The qualification lists a standard that has a new title The qualification lists a standard that has a new classification |
The following ESITO qualifications are not materially affected by the changes. They will be updated when they are next reviewed.
|
Qualification title |
Standard in the qualification |
|
National Certificate in Electricity Supply (Line Mechanic Distribution Live Work) (Level 5) [Ref: 1119] |
10531, 10535, 10537, 10540 |
|
National Certificate in Electricity Supply (Line Mechanic Transmission Live Work) (Level 5) [Ref: 1120] |
10531, 10535 |
All changes are in bold.
|
Key to review category |
| |
|
A |
Dates changed, but no other changes are made - the new version of the standard carries the same Id and a new version number | |
|
B |
Changes made, but the overall outcome remains the same - the new version of the standard carries the same Id and a new version number | |
|
C |
Major changes that necessitate the registration of a replacement standard with a new Id | |
|
D |
Standard will expire and not be replaced | |
Subfield Electricity Supply
Domain Electricity Supply - Live Work
|
Id |
Title |
Level |
Credit |
Review Category |
|
10531 |
Remove and install hardware and equipment on pole structures using live line hot sticks up to 110kV Remove and install hardware and equipment on structures using live line hot sticks up to 33kV |
5 |
20 |
B |
|
10535 |
Remove and install electricity network pole structures using live line hot stick Remove and install electricity network pole structures using live line hot stick up to 33kV |
5 |
20 |
B |
|
10536 |
Make and break live line connections using live line hot stick procedures up to 33kV |
4 |
10 |
B |
|
10537 |
Make and break live line connections using live line glove and barrier procedures Make and break live line connections using live line glove and barrier procedures up to 33kV |
4 |
10 |
B |
|
10538 |
Inspect, test, and clean live line tools and equipment |
4 |
6 |
B |
|
10540 |
Replace and install hardware on pole structures using glove and barrier and hot stick up to 33kV Replace and install hardware on structures using glove and barrier up to 33kV |
5 |
30 |
B |
|
10541 |
Remove and install pole structures using live line glove and barrier procedures up to 33kV |
5 |
20 |
B |
|
10542 |
Demonstrate knowledge of live line theory and procedures |
4 |
10 |
B |