Review of Glass Container Manufacturing unit standards
Subfield | Domain | ID |
Glass and Glazing | Glass Container Manufacturing | 18768 – 18772, 18919 – 18920, 18922, 18924, 23061 – 23073. |
Competenz has completed the review of the unit standards listed above.
The above unit standards were reviewed alongside the mandatory review of the Glass Container Manufacturing qualifications in response to the Targeted Review of Qualifications (TRoQ). The key stakeholder who is also the only user of these unit standards was consulted through review meetings and email correspondence.
With the alignment of standards against the new qualifications, there has been significant change to unit standard credits in order to better reflect the amount of time for learning and assessment to take place. The qualifications no longer include large elective components containing generic units and have a much more technical focus. These changes have reflected in the credit values of the new and reviewed technical unit standards which were also aligned against updated training requirements of the key stakeholder. The level of some unit standards has also increased, in alignment with the NZQA Level Descriptors.
Unit standard 18768 has been replaced by unit standards 28568 and 28569.
The title, level and credit value of unit standard 18769 have changed.
The title, level, and credit value of unit standard 18770 have changed.
Unit standard 18772 has been replaced by unit standards 28570 and 28571.
The title, level, and credit value of unit standard 18919 have changed.
The title, level and credit value of unit standard 18920 have changed.
The level and credit value of unit standard 18922 have increased.
Unit standard 18942 has been set to expire and has been replaced by four new unit standards 28564-28567.
The level of unit standard 23061 has increased from 1 to 2.
The title, level and credit value of unit standard 23062 have changed.
The level of unit standard 23063 has increased from 1 to 2.
The title of unit standard 23064 has changed.
The credit value of unit standard 23065 has increased from 8 to 75.
The level and credit value of unit standard 23066 have changed.
The title, level and credit value of unit standard 23067 have changed.
The title, level and credit value of unit standard 23068 have changed.
The title of unit standard 23069 has changed.
The title of unit standard 23070 has changed and the credits have decreased.
The level of unit standard 23071 has increased from 1 to 2.
The title of unit standard 23072 has changed and the level and credits have increased.
The title of unit standard 23073 has changed and the credits have increased.
Current consent for | Consent extended to | ||||
Nature of consent | Classification or ID | Level | Nature of consent | Classification or ID | Level |
Standard | 18768 | 1 | Standard | 28568, 28569 | 2 |
18769 | 2 | 18769 | 3 | ||
18770 | 2 | 18770 | 3 | ||
18772 | 2 | 28570, 28571 | 3 | ||
18919 | 2 | 18919 | 4 | ||
18920 | 3 | 18920 | 4 | ||
18922 | 3 | 18922 | 4 | ||
18924 | 4 | 28564, 28565, 28566, 28567 | 5 | ||
23061 | 1 | 23061 | 2 | ||
23062 | 1 | 23062 | 2 | ||
23063 | 1 | 23063 | 2 | ||
23066 | 1 | 23066 | 2 | ||
23067 | 2 | 23067 | 3 | ||
23068 | 3 | 23068 | 4 | ||
23071 | 1 | 23071 | 2 | ||
23072 | 2 | 23072 | 3 |
Key to type of impact | |
Affected | The qualification lists a reviewed classification (domain or subfield) in an elective set The qualification lists a standard that has changes to level or credits The qualification lists a C or D category standard |
Not materially affected | The qualification lists a standard that has a new title The qualification lists a standard that has a new classification |
The following Competenz qualifications are impacted by the outcome of this Review. These qualifications will expire as a result of the TRoQ process. The classifications and/or standards that generated the status Affected are listed in bold.
Ref | Qualification Title | Classification or ID |
1358 | National Certificate in Glass Container Manufacturing (Level | 18768, 23061, |
1) | 23062, 23063, | |
23066, 23071 | ||
1359 | National Certificate in Glass Container Manufacturing (Level | 18769, 18770, |
2) with strands in Batch and Furnace, Forming, Job Change, | 18772, 18919, | |
Quality Control, and Mould Repair | 18922, 23064, | |
23065, 23067, | ||
23072 | ||
1360 | National Certificate in Glass Container Manufacturing (Level | 18920, 18922, |
3) with strands in Batch and Furnace, Forming, Mould | 23068, 23069, | |
Repair, and Quality Control | 23073 | |
1378 | National Certificate in Engineering and Technology (Glass | 18919, 23064, |
Container Mould Maintenance) (Level 2) | 23072 | |
1379 | National Certificate in Engineering and Technology (Glass Container Mould Maintenance) (Level 3) | 23073 |
1462 | National Certificate in Glass Container Manufacturing (Level 4) | 18924, 23070 |
All changes are in bold.
Key to review category | |
A | Dates changed, but no other changes are made - the new version of the standard carries the same ID and a new version number |
B | Changes made, but the overall outcome remains the same - the new version of the standard carries the same ID and a new version number |
C | Major changes that necessitate the registration of a replacement standard with a new ID |
D | Standard will expire and not be replaced |
Manufacturing > Glass and Glazing > Glass Container Manufacturing
ID | Title | Level | Credit | Review Category |
18768 | Demonstrate knowledge of glass container | 1 | 5 | C |
manufacturing | ||||
28568 | Describe the manufacture of glass and the | 2 | 3 | New |
container forming process | ||||
28569 | Demonstrate knowledge of glass containers | 2 | 3 | New |
and glass container faults | ||||
18769 | Maintain supply of raw materials for glass furnace | 2 | 8 | B |
operations | 3 | 35 | ||
Receive raw materials and operate storage, | ||||
handling, and batching equipment in glass | ||||
container manufacturing | ||||
18770 | Perform analytical tests for batch and glass quality | 2 | 3 | B |
in accordance with enterprise procedure | ||||
Perform analytical tests for batch and glass | ||||
quality in glass container manufacturing | 3 | 20 |
ID | Title | Level | Credit | Review Category |
18772 | Operate glass container inspection and packaging | 2 | 8 | C |
equipment | ||||
28570 | Perform glass container packaging process | 3 | 24 | New |
operations | ||||
28571 | Inspect and perform fracture analysis on glass | 3 | 24 | New |
containers | ||||
18919 | Perform job changes on an independent section | 2 | 4 | B |
machine for glass container forming | ||||
Perform job changes on independent section | 4 | 30 | ||
machines for glass container forming | ||||
18920 | Perform advanced operations for glass container | 3 | 10 | B |
forming | 4 | 20 | ||
Perform glass container forming operations | ||||
18922 | Perform quality control on a glass container | 3 | 10 | B |
production line | 4 | 30 | ||
18924 | Control and optimise the glass container forming | 4 | 20 | C |
process | ||||
28564 | Control and optimise forehearth operations for | 5 | 25 | New |
glass container manufacturing | ||||
28565 | Control and optimise the feeder operation for | 5 | 15 | New |
glass container manufacturing | ||||
28566 | Control and optimise gob loading and delivery | 5 | 10 | New |
gear for glass container manufacturing | ||||
28567 | Control and optimise the independent section | 5 | 20 | New |
machines for glass container manufacturing | ||||
23061 | Demonstrate knowledge of batch house operations for glass container production | 1 2 | 2 | B |
23062 | Demonstrate knowledge of glass container | 1 | 6 | B |
conveying, inspection, packaging, and quality | ||||
control | ||||
Demonstrate knowledge of glass container | 2 | 2 | ||
manufacturing finished products operation | ||||
23063 | Demonstrate knowledge of forming equipment for the production of glass containers | 1 2 | 2 | B |
23064 | Operate off-line glass container forming equipment Demonstrate knowledge of and operate off-line glass container forming equipment | 2 | 4 | B |
23065 | Operate glass container forming equipment | 3 | 8 75 | B |
23066 | Demonstrate basic knowledge of glass furnace | 1 | 3 | B |
structure and operations | 2 | 2 | ||
23067 | Describe the principles, operation and control of a | 2 | 6 | B |
glass furnace | ||||
Describe the operation and control of a glass | 3 | 20 | ||
furnace | ||||
23068 | Control automatic raw material weighing and | 3 | 15 | B |
delivery equipment and operate a glass furnace | ||||
Control raw material weighing and delivery | ||||
equipment and operate a glass furnace | 4 | 38 |
ID | Title | Level | Credit | Review Category |
23069 | Carry out emergency operation of plant services and equipment for glass container production Carry out operation of plant services and equipment during systems failure for glass container production | 3 | 12 | B |
23070 | Demonstrate knowledge of glass container raw materials and control glass furnace operations Demonstrate knowledge of raw materials used in glass container manufacturing | 4 | 20 10 | B |
23071 | Demonstrate knowledge of mould equipment for glass container production | 1 2 | 2 | B |
23072 | Prepare, service, and repair mould equipment for | 2 | 16 | B |
glass container production | ||||
Prepare and service mould equipment for glass | 3 | 35 | ||
container manufacturing | ||||
23073 | Perform fault diagnosis, repair and modification of mould equipment for glass container production Perform fault diagnosis, repair, modification and preparation of mould equipment for glass container manufacturing | 3 | 10 40 | B |