Field Engineering and Technology
Review of Irrigation unit standards
Subfield |
Domain |
ID |
Water Industry |
Irrigation |
20955, 25136, 27445, 27556, 28925, 28926, 28932-28936 |
Primary Industry Training Organisation has completed the review of the unit standards listed above.
Date new versions published February 2020
Planned review date December 2024
Summary
Unit standards were reviewed during September and November 2019 by email and meeting with the External Working Group (EWG), comprised of representatives from the Irrigation industry. The EWG consulted with the wider irrigation industry to determine if any changes were required to unit standards. The EWG agreed that the unit standards only required minor changes. Content was amended or deleted to meet current technical requirements, and where appropriate regulatory requirements were added or deleted.
Main changes
· Unit standard content was updated to reflect current industry practices.
· Unit standards 20955 and 25136 were expired as they are no longer required by industry and have not been used since 2015.
Category D unit standards will expire at the end of December 2022
Detailed list of unit standards – classification, title, level, and credits
All changes are in bold.
Key to review category |
|
A |
Dates changed, but no other changes are made - the new version of the standard carries the same ID and a new version number |
B |
Changes made, but the overall outcome remains the same - the new version of the standard carries the same ID and a new version number |
C |
Major changes that necessitate the registration of a replacement standard with a new ID |
D |
Standard will expire and not be replaced |
Engineering and Technology > Water Industry > Irrigation
ID |
Title |
Level |
Credit |
Review Category |
20955 |
Demonstrate knowledge of irrigation systems, components, and performance |
4 |
6 |
D |
25136 |
Describe water metering and soil moisture devices and their selection, for measuring performance of irrigation systems |
4 |
8 |
D |
27445 |
Select, oversee installation, and commission a full pipe water measurement system |
5 |
8 |
B |
27556 |
Carry out a full pipe water measurement system verification |
5 |
5 |
B |
28925 |
Carry out an irrigation system performance assessment |
4 |
25 |
B |
28926 |
Compare and interpret a specific irrigation system's performance against the system specifications, and report findings Interpret irrigation system performance results against system specifications, and report findings |
4 |
15 |
B |
28932 |
Design and plan an irrigation system Plan an irrigation system |
5 |
75 |
B |
28933 |
Prepare the design and delivery documentation for an irrigation system |
5 |
15 |
B |
28934 |
Determine irrigation system requirements for a commercial enterprise |
4 |
10 |
B |
28935 |
Carry out irrigation system scheduling on a daily and seasonal basis for an irrigation site Carry out seasonal irrigation system scheduling for an irrigation site |
4 |
5 |
B |
28936 |
Manage the planning, operation and maintenance of an irrigation system |
4 |
25 |
B |