Field Engineering and Technology
Revision of Temporary Traffic Management unit standards
Subfield |
Domain |
ID |
Infrastructure Works |
Temporary Traffic Management |
31959, 31960 |
Connexis Infrastructure ITO has completed the revision of the unit standards listed above.
Date new versions published September 2020
Planned review date (no change) December 2024
Summary
The revision process was held in conjunction with Waka Kotahi New Zealand Transport Agency.
Waka Kotahi New Zealand Transport Agency identified changes for two temporary traffic management unit standards to align them with new requirements of the Code of Practice for Temporary Traffic Management (CoPTTM).
Draft versions were distributed to industry technical advisers and final copies were endorsed by Waka Kotahi New Zealand Transport Agency.
Main changes
· Two performance criteria were added to unit standard 31959.
· The title of unit standard 31960 was amended.
· Two outcomes were added, and performance criteria were amended for unit standard 31960.
The last date for assessment of superseded versions of these unit standards is December 2020
Detailed list of unit standards – classification, title, level, and credits
All changes are in bold.
Engineering and Technology > Infrastructure Works > Temporary Traffic Management
ID |
Title |
Level |
Credit |
31959 |
Demonstrate knowledge of stakeholders and operational requirements for temporary traffic management |
3 |
5 |
31960 |
Maintain the worksite under temporary traffic management Maintain the TTM worksite, install and remove a worksite, and undertake an inspection activity |
3 |
10 |