Field Planning and Construction
Review of Drainlaying unit standards
Subfield |
Domain |
ID |
Plumbing, Gasfitting and Drainlaying |
Drainlaying |
30529-30531, 30534, 30535, 30538, 30539, 30577-30579, 30600, 30601, 30612, 30613 |
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council (Waihanga Ara Rau WDC) reviewed the unit standards listed above.
Date new versions published May 2024
Planned review date December 2029
Summary
Waihanga Ara Rau WDC reviewed these unit standards in line with the scheduled 5-year review cycle to update them to align to current industry practice, and to ensure that they are fit for purpose.
A series of Technical Advisory Group (TAG) meetings were held between November 2022 and November 2023 to complete this review. The TAG consisted of industry and provider representatives with consent to assess, and representatives from industry stakeholder organisations including the Plumbing, Gasfitting, and Drainlaying Board and the Ministry of Business, Innovation and Employment.
Following the review, public consultation was held in November and December 2023. Feedback received was reviewed and decisions were made in consultation with the TAG group representatives resulting in the changes below.
Main changes
· Guidance information, legislation, performance criteria and range statements were amended across the suite of unit standards to reflect the content and scope of the work, and to align with current industry practice.
· Minor wording changes were made across the suite for clarity and to meet current industry terms.
· Unit standard 30529 had the title amended and credits were reduced to 3 to accurately reflect the notional hours required for learning and assessment completion.
· Unit standards 30531, and 30578 were designated as expiring without replacement. This is due to the maintenance component not being completed at the time of installation and this was a barrier for completion.
· Three new unit standards (33326, 33328 and 33330) have been developed with separate installation and maintenance outcomes.
· Unit standard 30539 was designated as expiring and replaced by two new unit standards (33357 and 33358) with the installation outcomes and maintenance outcomes separated.
· Unit standards 30579, 30601, 30612 and 30613 had their titles amended to better reflect the outcomes and to align with current industry terms.
· Unit standard 30600 had the title amended to reflect industry terms, and the credits were increased to 5 to accurately reflect the notional hours required for learning and assessment completion.
Category C and D unit standards will expire at the end of December 2028
Impact on existing organisations with consent to assess
Current consent for |
Consent extended to |
||||
Nature of consent |
Classification or ID |
Level |
Nature of consent |
Classification or ID |
Level |
Standard |
30539 |
4 |
Standard |
33357, 33358 |
4 |
Detailed list of unit standards – classification, title, level, and credits
All changes are in bold.
Key to review category |
|
A |
Dates changed, but no other changes are made – the new version of the standard carries the same ID and a new version number |
B |
Changes made, but the overall outcome remains the same – the new version of the standard carries the same ID and a new version number |
C |
Major changes that necessitate the registration of a replacement standard with a new ID |
D |
Standard will expire and not be replaced |
Planning and Construction > Plumbing, Gasfitting and Drainlaying > Drainlaying
ID |
Title |
Level |
Credit |
Review Category |
30529 |
Make as-built drawings and record variations to job specifications for drainlaying jobs Prepare as-built drawings and record variations to job specifications for drainlaying jobs |
4 |
5
3 |
B |
30530 |
Demonstrate knowledge of the installation and maintenance of foulwater drains |
4 |
10 |
B |
30531 |
Install and maintain foulwater drains |
4 |
5 |
D |
30534 |
Demonstrate knowledge of wet and dry inspection chambers |
3 |
2 |
B |
30535 |
Install inspection chambers |
3 |
2 |
B |
30538 |
Demonstrate knowledge of installation, commissioning, and maintenance of on-site wastewater treatment systems |
4 |
12 |
B |
30539
33357
33358 |
Install, commission, and maintain on-site wastewater treatment systems Install and commission on-site wastewater treatment and disposal systems Maintain on-site wastewater treatment and disposal systems |
4
4
4 |
8
7
3 |
C |
30577 |
Demonstrate knowledge of the installation and maintenance of stormwater handling systems |
4 |
9 |
B |
30578 |
Install and maintain stormwater handling systems |
4 |
4 |
D |
30579 |
Install and complete wingwall structures for stormwater handling systems Install wingwall structures for stormwater handling systems |
4 |
2 |
B |
30600 |
Demonstrate knowledge of pumps used in drainlaying systems Demonstrate knowledge of pumped drainage systems |
4 |
3
5 |
B |
30601 |
Install pumps for drainlaying systems Install pumps for drainage systems |
4 |
2 |
B |
30612 |
Demonstrate knowledge of trade waste interceptor traps Describe trade waste systems |
3 |
4 |
B |
30613 |
Install food grease interceptor traps Install trade waste interceptor traps |
3 |
2 |
B |
33326 |
Maintain drainage systems |
4 |
2 |
NEW |
33328 |
Install stormwater handling systems |
4 |
3 |
NEW |
33330 |
Install foulwater drains |
4 |
4 |
NEW |