Waihanga Ara Rau Construction and Infrastructure Workforce Development Council has completed the review of the unit standards listed above.
Date new versions published May 2024
Planned review date December 2029
Summary
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council initiated a review of unit standards in the Plumbing domain which was triggered by the regular 5-year review cycle.
The unit standards in this application have been reviewed to update them in line with current industry practice, and to ensure they are fit for purpose.
A series of Technical Advisory Group (TAG) meetings were held between November 2022 and November 2023 to complete this review. The Technical Advisory Group consisted of industry and provider representatives with consent to assess, and representatives from industry stakeholder organisations including the Plumbing, Gasfitting, and Drainlaying Board and the Ministry of Business, Innovation and Employment.
Following the review, public consultation was held in November and December 2023. Feedback received was reviewed and decisions were made in consultation with the TAG group representatives resulting in the changes below.
Main changes
· Guidance information, legislation, performance criteria and range statements were amended across the suite of unit standards to reflect the content and scope of the work, and in line with current industry practice.
· Minor wording changes were made across the suite for clarity and to meet current industry terms.
· Unit standard 23848 was designated to expire without replacement as this is no longer required by industry.
· Unit standards 30543, 30544, 30551, 30552, 30554, 30608 and 30615 were designated to expire and will not be replaced. This is due to maintenance not being completed at the time of installation and this was a barrier to completion.
· Nine new unit standards (33332 –33340) have been developed with separate installation and maintenance outcomes.
· Unit standard 23847 was moved up to level 4 to reflect the complexity of the outcomes required.
· Unit standard 30527 had a title change and credits were reduced to 3 to accurately reflect the notional hours required for learning and assessment completion.
· Unit standards 30545, 30598, 30599, 30605, 30606, 30609 and 30614 had titles amended to more accurately reflect the outcomes, and align with current industry terms.
· Unit standard 30555 was moved down to level 3 to more accurately reflect the level of performance required.
· Unit standard 30604 had the credit value increased to 6 credits to more accurately reflect the notional hours required for learning and assessment completion.
· Unit standard 30609 had an additional outcome added to cover on-site drinking water treatment in accordance with The Drinking Water Acceptable Solutions (Taumata Arowai).
· Unit standard 30611 had the credit value increased to 5 credits to more accurately reflect the notional hours required for learning and assessment completion.
Category D unit standards will expire at the end of December 2028.
Detailed list of unit standards – classification, title, level, and credits
All changes are in bold.
Key to review category |
|
A |
Dates changed, but no other changes are made – the new version of the standard carries the same ID and a new version number |
B |
Changes made, but the overall outcome remains the same – the new version of the standard carries the same ID and a new version number |
C |
Major changes that necessitate the registration of a replacement standard with a new ID |
D |
Standard will expire and not be replaced |
Planning and Construction > Plumbing, Gasfitting and Drainlaying > Plumbing
ID |
Title |
Level |
Credit |
Review Category |
23847 |
Prepare to test, and inspect and test, water supply backflow prevention devices |
3 4 |
4 |
B |
23848 |
Describe suitability, installation, and testing of water supply backflow prevention devices, and fault identification |
3 |
4 |
D |
30527 |
Make as-built drawings and record variations to job specifications for plumbing jobs Prepare as-built drawings and record variations to job specifications for plumbing jobs |
4 |
5
3 |
B |
30542 |
Demonstrate knowledge of foul water systems |
4 |
9 |
B |
30543 |
Install, secure, and maintain foul water systems in accordance with NZ Building Code G13 Acceptable Solution 1 |
4 |
6 |
D |
30544 |
Install, secure, and maintain foul water systems in accordance with NZ Building Code G13 Acceptable Solution 3 |
4 |
6 |
D |
30545 |
Demonstrate knowledge of profiled metal and translucent roofing Demonstrate knowledge of the installation of profiled metal and translucent roofing |
4 |
5 |
B |
30546 |
Install profiled metal roofing and cladding |
4 |
10 |
B |
30547 |
Demonstrate knowledge of relevant profiled metal cladding installation methods, trade practice, and licensing |
4 |
5 |
B |
30548 |
Demonstrate knowledge of making and installing flashings for profiled metal roofing and cladding |
4 |
5 |
B |
30549 |
Demonstrate knowledge of the installation and maintenance of rainwater handling and harvesting systems |
4 |
4 |
B |
30550 |
Demonstrate knowledge of the installation, commissioning, and maintenance of hot water supply systems |
4 |
10 |
B |
30551 |
Position, install, commission, and maintain low pressure hot water supply systems |
4 |
7 |
D |
30552 |
Position, install, commission, and maintain mains pressure hot water supply systems |
4 |
6 |
D |
30553 |
Demonstrate knowledge of the installation and maintenance of sanitary appliances and fixtures |
4 |
8 |
B |
30554 |
Select, position, install, connect, commission, and maintain sanitary appliances and fixtures |
4 |
6 |
D |
30555 |
Install basic sanitary plumbing systems |
4 3 |
5 |
B |
30598 |
Demonstrate knowledge of the installation, testing, and maintenance of water supply backflow prevention devices Demonstrate knowledge of selection, installation, testing, and maintenance of water supply backflow prevention devices |
4 |
4 |
B |
30599 |
Determine the position of water supply backflow prevention devices, and install, test, and maintain devices Determine the position, install and commission water supply backflow prevention devices |
4 |
3 |
B |
30603 |
Demonstrate knowledge of plumbing aspects of domestic fire sprinkler systems |
4 |
3 |
B |
30604 |
Demonstrate knowledge of pumps used for water supply and disposal systems in plumbing |
4 |
3 6 |
B |
30605 |
Demonstrate knowledge of installing, securing, and maintaining water supply pipework in buildings Demonstrate knowledge of installing, supporting, and maintaining water supply pipework in buildings |
4 |
7 |
B |
30606 |
Determine water supply requirements in buildings, and install, secure, and maintain pipework Determine water supply requirements in buildings, install and support water supply pipework |
3 |
6 |
B |
30607 |
Demonstrate knowledge of the installation and maintenance of solid fuel space heaters and flues |
4 |
3 |
B |
30608 |
Position, install, and maintain solid fuel space heaters and flues |
4 |
2 |
D |
30609 |
Demonstrate knowledge of alternative water supply and water storage for sanitary plumbing Describe alternative water supply, water storage, and on-site drinking water treatment systems for sanitary plumbing |
4 |
3 |
B |
30610 |
Demonstrate knowledge of the installation, testing, commissioning, and maintenance of solar water heating systems |
4 |
5 |
B |
30611 |
Carry out installation, testing, commissioning, and maintenance of solar water heating systems |
4 |
4 5 |
B |
30614 |
Demonstrate knowledge of the installation and maintenance of water mains and water supply systems Demonstrate knowledge of the installation and maintenance of water main systems |
4 |
4 |
B |
30615 |
Install and maintain water mains and water supply systems |
4 |
4 |
D |
33332 |
Install and secure foul water systems in buildings in accordance with Building Code Clause G13 Acceptable Solution 1 |
4 |
4 |
NEW |
33333 |
Maintain foul water systems and sanitary fixtures |
4 |
2 |
NEW |
33334 |
Install and secure foul water systems in buildings in accordance with Building Code Clause G13 Acceptable Solution 3 |
4 |
4 |
NEW |
33335 |
Maintain hot and cold water supply systems |
4 |
5 |
NEW |
33336 |
Position, install, and commission low pressure hot water supply systems |
4 |
6 |
NEW |
33337 |
Position, install and commission solid fuel space heaters and flues |
4 |
4 |
NEW |
33338 |
Position, install, and commission mains pressure hot water supply systems |
4 |
4 |
NEW |
33339 |
Install, test, and commission water main systems |
4 |
3 |
NEW |
33340 |
Install and commission sanitary appliances and fixtures |
4 |
5 |
NEW |