Field: Planning and Construction
Reviewed qualification
Ref |
Version |
Qualification Title |
Credits |
3512 |
1 |
New Zealand Certificate in Roofing (Installation) (Level 4) with strands in Concrete or Clay Tile Roof, Profiled Metal Roof and Wall Cladding, Metal Tile Roof, Roof Membrane Systems, and Shingle or Slate Roof |
180-210 |
Review information
Qualification Developer |
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council |
Reason for the review |
Scheduled qualification review |
Review date |
June 2023 |
Outcome date |
November 2024 |
Next review date |
31 November 2029 |
Summary of review and consultation process |
Waihanga Ara Rau and representatives from the roofing industry reviewed the New Zealand Certificate in Roofing (Installation) (Level 4) from June 2023 to April 2024. A technical advisory group with representatives from the roofing industry, qualification providers and RANZ conducted online meetings. The recommendations informed the qualification review, and amendments were made to the qualification content. The wider roofing industry was consulted again in May 2024 for final feedback. Documents and information about the review were published on the Waihanga Ara Rau Workforce Development Council Website throughout the review period. Ongoing industry feedback opportunities were available during this period. |
Main changes resulting from the review process |
- Qualification title change to include new strands- New Zealand Certificate in Roofing (Installation) (Level 4) with strands in Concrete or Clay Tile Roof, Liquid Roof Membrane Systems, Metal Tile Roof, Profiled Metal Roof and Wall Cladding, Shingle or Slate Roof, Single Layer Roof Membrane Systems, and Torch On Roof Membrane Systems. - Qualification credit range changed to 165-190. - Graduate profile outcomes (GPOs) amended to include the skills and knowledge required. - Graduate profile outcome credits amended to reflect the skills and knowledge required. - Strand and GPO 8 split into three separate membrane strands – GPO 6 Liquid Roof Membrane Systems, GPO 10 Single Layer Roof Membrane Systems, and GPO 11 Torch On Roof Membrane Systems. - Order of strands changed to alphabetise. - Education pathway amended to include the New Zealand Certificate in Construction Trades Supervision (Level 5) with strands in Commercial Construction, Construction Related Manufacturing, Construction Related Trades, and Residential Building [Ref: 4237]. - Qualification specifications amended to include updated evidence requirements and general conditions. - Transition information amended to reflect changes to dates and version. |
Review outcome
Ref: |
Version |
Qualification Title |
Outcome category |
New qualification ID/version (as applicable) |
3512 |
1 |
New Zealand Certificate in Roofing (Installation) (Level 4) with strands in Concrete or Clay Tile Roof, Profiled Metal Roof and Wall Cladding, Metal Tile Roof, Roof Membrane Systems, and Shingle or Slate Roof New Zealand Certificate in Roofing (Installation) (Level 4) with strands in Concrete or Clay Tile Roof, Liquid Roof Membrane Systems, Metal Tile Roof, Profiled Metal Roof and Wall Cladding, Shingle or Slate Roof, Single Layer Roof Membrane Systems, and Torch On Roof Membrane Systems. |
B-New version of qualification |
3512-2 |
Qualification review outcome categories
Outcome |
Result |
Category |
Minor changes to the qualification |
Qualification version number and ID (Ref) remain the same. New review date is required. |
A |
Moderate changes to the qualification |
New qualification version number. Ref/ID remains the same. New review date is required. |
B |
Significant changes to the qualification |
New replacement qualification with a new Ref/ID The existing qualification will expire. |
C |
The qualification is no longer required by industry |
The qualification will expire with no replacement. |
D |
Transition information
Ref: |
Version |
Qualification Title |
Last date of entry* |
Last date of assessment |
3512 |
1 |
New Zealand Certificate in Roofing (Installation) (Level 4) with strands in Concrete or Clay Tile Roof, Profiled Metal Roof and Wall Cladding, Metal Tile Roof, Roof Membrane Systems, and Shingle or Slate Roof |
N/A |
31 December 2027 |
Any additional information, including Qualification Developer contact details.
It is the intention that no existing trainee should be disadvantaged by these transition arrangements. Any person who considers they have been disadvantaged should contact the qualification developer: Waihanga Ara Rau Construction and Infrastructure Workforce Development Council PO Box 445 Wellington 6140 Telephone: 04 909 0174 Website: www.waihanagaararau.nz |