Field Engineering and Technology
Registration of skill standards and review of unit standards for Field Hydrology
|
Subfield |
Domain |
ID |
|
Water Industry |
Field Hydrology |
28800 - 28803, 28805 - 28807 |
The Muka Tangata – People Food and Fibre Workforce Development Council has reviewed the unit standards listed above.
Date new versions published September 2025
Planned review date December 2030
Summary
Muka Tangata has reviewed the above standards as part of the review cycle. Over the past 6 months the project has been undertaken in close consultation with Technical Advisory Group (TAG) members and with input and support from key stakeholders across the Field Hydrology sector. As a result of the above review unit standards were expired and replaced by skill standards below.
Main changes
· Six skill standards were developed to replace six unit standards.
· Unit standard 28807 was expired without replacement.
· The standard setting body details and contact and coverage information were updated from the Primary Industry Training Organisation to Muka Tangata – People, Food and Fibre Workforce Development Council.
Category C and D unit standards will expire at the end of December 2027.
Detailed list of standards – classification, title, level, and credits
All changes are in bold.
|
Key to review category |
|
|
A |
Dates changed, but no other changes are made - the new version of the standard carries the same ID and a new version number |
|
B |
Changes made, but the overall outcome remains the same - the new version of the standard carries the same ID and a new version number |
|
C |
Major changes that necessitate the registration of a replacement standard with a new ID |
|
D |
Standard will expire and not be replaced |
Engineering and Technology > Water Industry > Field Hydrology
|
ID |
Title |
Level |
Credit |
Review Category |
|
28800 40888 |
Operate and maintain hydrometric stations Maintain and operate hydrometric stations |
5
|
25 15 |
C
|
|
28801
40892 |
Design, plan and manage the construction of a hydrometric station Plan and coordinate hydrometric station installation |
5
|
15
25 |
C |
|
28802 40887 |
Carry out discharge measurement by wading Conduct and compile discharge measurement by wading |
5
|
20 20 |
C |
|
28803
40890 |
Carry out discharge measurements using a range of platforms and methods Conduct and compile discharge measurements using various methods and platforms |
5
|
20
25 |
C |
|
28805 40889 |
Verify, process and archive hydrometric data Process and analyse hydrometric data |
5
|
30 20 |
C |
|
28806
40891 |
Construct, apply, evaluate and store hydrometric rating curves Construct and evaluate hydrometric rating curves |
5
|
20
30 |
C |
|
28807 |
Present hydrometric data reviews and provide information for users |
5 |
10 |
D |