Field Service Sector
Registration of skill standards and review of unit standards for Lifting Equipment
|
Subfield |
Domain |
ID |
|
Lifting Equipment
|
Elementary Scaffolding |
19621-19623, 20855-20860, 23223-23228, 23715, 30628 |
|
Intermediate Scaffolding |
23716-23722, 26606, 32877 |
|
|
Rigging and Scaffolding Safety |
20861 |
Construction and Specialist Trades Industry Skills Board has reviewed unit standards in the domains listed above.
Date new versions published July 2026
Planned review date December 2031
Summary
Waihanga Ara Rau reviewed the above unit standards and developed skill standards to be used in programmes leading to the New Zealand Certificate in Scaffolding (Elementary) (Level 4) [Ref: 3708] and New Zealand Certificate in Scaffolding (Intermediate) (Level 4) [Ref: 3710]. This review was conducted alongside that of the qualifications, which were also updated in alignment.
The review of unit standards and the development of skill standards was overseen by a Technical Advisory Group (TAG) consisting of representatives from the scaffolding industry, the New Zealand Association for Scaffolding, Access and Rigging (SARNZ) and provider representatives, with the appropriate knowledge and skills in scaffolding, programme development, and assessment. The TAG convened in July 2025 with online meetings to develop the skill standards held from August 2025 through to November 2025.
As a result of the review; some existing unit standards in the elementary and intermediate scaffolding domains will be replaced with new skill standards to better meet industry needs and some unit standards in the elementary and intermediate scaffolding domains will be expired without replacement because they are no longer fit for purpose.
The draft skill standards were distributed for wider industry consultation with key stakeholders, including providers and the New Zealand Association for Scaffolding, Access and Rigging (SARNZ). All feedback was considered and actioned where appropriate.
The responsibility for these standards has been transferred from Waihanga Ara Rau WDC to Construction and Specialist Trades ISB to reflect the VET reforms. Construction and Specialist Trades ISB has finalised these standards for approval.
Main Changes
· A total of 23 unit standards (14 in elementary scaffolding and nine in intermediate scaffolding) have been expired and replaced with new skill standards.
· Five unit standards in the elementary scaffolding domain have been expired without replacement as they are no longer fit for purpose.
· 11 new elementary scaffolding skill standards and eight new intermediate scaffolding skill standards have been developed to better support industry requirements and learner progression pathways.
Category C and D unit standards will expire at the end of December 2027
Impact on existing organisations with consent to assess
|
Current consent for |
Consent extended to |
||||
|
Nature of consent |
Classification or ID |
Level |
Nature of consent |
Classification or ID |
Level |
|
Subfield |
Lifting Equipment |
3 |
Standards |
41198, 41199, 41200, 41201, 41202, 41203, 41204, 41205, 41207 |
4 |
|
Domain |
Elementary Scaffolding |
3 |
Standards |
41198, 41199, 41200, 41201, 41202, 41203, 41204, 41205, 41207 |
4 |
|
Standards |
20858, 23223 and 23224 |
3 |
Standard |
41200 |
4 |
|
Standard |
20860 |
3 |
Standard |
41202 |
4 |
|
Standard |
23226 |
3 |
Standard |
41203 |
4 |
|
Standard |
23228 |
3 |
Standard |
41204 |
4 |
|
Standard |
23715 |
4 |
Standard |
41206 |
4 |
|
Standard |
23716 |
4 |
Standard |
41208 |
4 |
|
Standard |
23717 |
4 |
Standard |
41209 |
4 |
|
Standard |
23718 |
4 |
Standard |
41210 |
4 |
|
Standard |
23719 |
4 |
Standard |
41211 |
4 |
|
Standard |
23720 |
4 |
Standard |
41212 |
4 |
|
Standard |
30628 |
3 |
Standard |
41205 |
4 |
Detailed list of unit standards – classification, title, level, and credits
All changes are in bold.
|
Key to review category |
|
|
A |
Dates changed, but no other changes are made - the new version of the standard carries the same ID and a new version number |
|
B |
Changes made, but the overall outcome remains the same - the new version of the standard carries the same ID and a new version number |
|
C |
Major changes that necessitate the registration of a replacement standard with a new ID |
|
D |
Standard will expire and not be replaced |
Service Sector > Lifting Equipment
|
ID |
Domain |
Title |
Level |
Credit |
Review Category |
|
20861
41207 |
Rigging and Scaffolding Safety Elementary Scaffolding |
Demonstrate, at height, safety procedures for the erection and dismantling of scaffolding Carry out safety procedures at height during the erection and dismantling of scaffolding |
3
4 |
8
15 |
C |
Service Sector > Lifting Equipment > Elementary Scaffolding
|
ID |
Title |
Level |
Credit |
Review Category |
|
19621 |
Interpret and apply legislative requirements in the design of scaffolding works |
3 |
3 |
D |
|
19622 |
Use and maintain scaffolding hand and portable power tools |
3 |
2 |
D |
|
19623 41198 |
Use tube and coupler in standing proprietary scaffolds Use tube and coupler systems in standing proprietary scaffolds |
3 4 |
6 10 |
C |
|
20855 |
Handle and maintain basic scaffolding components |
2 |
5 |
D |
|
20856 20857
41199 |
Plan and prepare for the erection of scaffolding Prepare a scaffolding site for the basing out of scaffolding Plan and prepare for the basing out and erection of a scaffold |
3 3
4 |
5 5
10 |
C
|
|
20858 23223 23224
41200 |
Base out tube and coupler scaffolding Base out returns for tube and coupler scaffolding Erect and dismantle standing tube and coupler scaffolding Base out, erect, and dismantle tube and coupler scaffolding |
3 3 3
4 |
10 8 10
20 |
C
|
|
20859 23227 41201 |
Base out proprietary frame scaffolding Erect and dismantle standing proprietary scaffolding Base out, erect, and dismantle proprietary frame scaffolds |
3 3 4 |
4 6 8 |
C
|
|
20860 41202 |
Base out individual component proprietary scaffolding Base out, erect, and dismantle individual component proprietary scaffolding |
3 4 |
6 12 |
C
|
|
23225 |
Erect and dismantle mobile scaffolding |
3 |
4 |
D |
|
23226 41203 |
Erect and dismantle proprietary falsework Base out, erect, and dismantle elementary proprietary falsework |
3 4 |
4 10 |
C
|
|
23228 41204 |
Complete a scaffolding inspection compliance report Inspect elementary scaffolding and complete a scaffolding inspection compliance report |
3 4 |
4 10 |
C
|
|
23715 41206 |
Design, erect, and dismantle scaffolding ties Design, erect, and dismantle scaffolding ties and repair attachment points |
4 4 |
6 10 |
C
|
|
30628
41205 |
Demonstrate and apply knowledge of leadership skills and communicate instructions on a scaffolding worksite Lead work activities for elementary scaffolding operations |
3
4 |
3
6 |
C
|
|
41216
|
Handle, load, and unload scaffolding equipment on a heavy goods vehicle |
3 |
5 |
NEW |
Service Sector > Lifting Equipment > Intermediate Scaffolding
|
ID |
Title |
Level |
Credit |
Review Category |
|
23716 41208 |
Erect and dismantle vessel scaffolding Plan, prepare, erect, and dismantle vessel scaffolding |
4 4 |
10 10 |
C
|
|
23717 41209 |
Erect and dismantle birdcage scaffolding Plan, prepare, erect, and dismantle birdcage scaffolding |
4 4 |
10 10 |
C
|
|
23718 41210 |
Erect and dismantle catch fans Plan, prepare, erect, and dismantle catch fans |
4 4 |
6 6 |
C
|
|
23719
41211 |
Erect, operate, and dismantle proprietary winches on scaffolding Plan, prepare, erect, operate, and dismantle proprietary winches on scaffolding |
4
4 |
6
6 |
C
|
|
23720 41212 |
Erect, operate, and dismantle mast climbers Plan, prepare, erect, operate, and dismantle mast climbers |
4 4 |
6 6 |
C
|
|
23721 41213 |
Erect and dismantle sloping platforms Plan, prepare, erect, and dismantle sloping platforms |
4 4 |
6 7 |
C
|
|
23722
41214 |
Supervise the erection and dismantlement of scaffolding Lead work activities for intermediate scaffolding operations |
4
4 |
10
5 |
C
|
|
26606
32877 41215 |
Erect and dismantle simple cantilevers from an existing scaffold Design, erect, and dismantle proprietary trusses Design, erect, and dismantle proprietary trusses and spurred scaffolding |
4
4 4 |
6
15 18 |
C
|