Find Education Organisations - Prepare, erect, position, and strip formwork for in-situ concrete construction up to 1.2m high
There are 1 Education Organisations with consent to assess for the standard Prepare, erect, position, and strip formwork for in-situ concrete construction up to 1.2m high
Name | Location | Consent to assess for | |
---|---|---|---|
New Zealand Defence Force (NZDF) | Palmerston North | Construction Trades (to level 3) | View details » |