Domain - Quantity Surveying
TOP > Planning and Construction > Construction > Quantity Surveying
0 Qualifications | 7 Assessment Standards (7 Units) | View Education Organisations with Consent to Assess |
Qualifications Domain-full
No qualifications currently registered at this level. Also check fields and sub-fields.
Assessment Standards
Hide education organisations, CMR & purpose »
Level 4
Prepare and interpret construction programmes for quantity surveying
This standard has expired and is no longer available.
Version 2 This unit standard replaced unit standard 10045.
27152 Unit Standard 5 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to, for quantity surveying: evaluate construction methodologies and sequence of construction, produce a construction programme for a simple project, and interpret a computer generated construction programme for a complex project.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Level 5
Measure schedules of quantities for specific trade sections for small buildings
This standard has expired and is no longer available.
Version 8
10039 Unit Standard 20 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to, for small buildings: assemble quantity surveying documentation relevant to specific trade sections, and measure schedules of quantities for specific trade sections from trade section documentation.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Estimate costs for medium or large building projects
This standard has expired and is no longer available.
Version 2 This unit standard replaced unit standard 10041.
27151 Unit Standard 10 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to, for medium and large buildings: explain the role of the schedule of quantities in preparing a tender submission; build up unit rates for measured items from a schedule of quantities; research building material market rates and conditions; obtain and use quotations; apply overheads, profit, and on-cost items to built-up unit rates; and collate all priced components into a tender submission.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Estimate costs for a small building project
This standard has expired and is no longer available.
Version 2 This unit standard replaced unit standard 9658.
27155 Unit Standard 15 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to, for a small building: explain the role of the schedule of quantities in preparing a tender submission; build up unit rates for measured items from specific schedule of quantity trade sections for a small building obtain and use material and equipment quotations; apply overheads, profit, and on-cost items to built-up unit rates; and collate all priced components into a tender submission.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Level 6
Complete preliminary estimates and cost plans for medium and large building projects
This standard has expired and is no longer available.
Version 8
10043 Unit Standard 15 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: complete preliminary estimates for a medium or large building; compile an elemental cost plan for a medium or large building; and prepare cashflow statements to meet client requirements based on the cost plan for a medium or large building.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Administer contracts and value building works
This standard has expired and is no longer available.
Version 9
10044 Unit Standard 15 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: establish contract administration communication protocols; value work executed; evaluate, prepare and present costs of variations; evaluate, prepare and present fluctuations in cost; evaluate, prepare and present the cost of time extensions; adjust included sums in accordance with contract documentation; and prepare and present interim and final account statements.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Measure schedules of quantities for specialist trade sections for quantity surveying
This standard has expired and is no longer available.
Version 2 This unit standard replaced unit standard 10040.
27150 Unit Standard 25 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: assemble quantity surveying documentation relevant to specialist trade sections; measure schedules of quantities for specialist trade sections, including services, from project information; and demonstrate knowledge of measuring techniques for specific sections of civil engineering work.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Data as at 13 February 2025