Framework search results
Assessment Standards
| Electricity Supply - Transmission Networks | |||||||||
| Level 3 | |||||||||
| 20412 | Unit |
Carry out a line patrol on an electricity supply network This standard has expired and is no longer available. |
6 Credits | ||||||
| Version 4 | |||||||||
| View Education Organisations with Consent to Assess | |||||||||
| People credited with this unit standard are able to: plan and prepare to carry out a line patrol; inspect access tracks; inspect pole structures; inspect vegetation near electrical lines; and report line patrol results. | |||||||||
|
|||||||||
Data as at 2025-11-04 23:01:09.333