Domain - Agricultural Contracting

Domain - Agricultural Contracting

Search Standards

All unit standards registered on the Directory of Assessment Standards may be accessed here. 

TOP > Agriculture, Forestry and Fisheries > Rural Contracting > Agricultural Contracting

Qualifications Domain-full

No qualifications currently registered at this level. Also check fields and sub-fields.

Assessment Standards

Hide education organisations, CMR & purpose  »

Level 2

Demonstrate knowledge of health and safety in a rural or agricultural contracting workplace

Word  PDF

Version 3

19578 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of the requirements for health and safety in a rural or agricultural contracting workplace; complete a risk assessment for a rural or agricultural contracting worksite; describe health and safety procedures for a rural or agricultural contracting workplace; and describe procedures for monitoring and maintaining PPE and health and safety systems and documentation for a rural or agricultural contracting workplace.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Check and drive a self-propelled agricultural contracting machine
This standard has expired and is no longer available.

Version 6

6256 Unit Standard 3 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: recognise occupational hazards associated with operating a self-propelled machine; check self-propelled agricultural contracting machine before use; and operate self-propelled agricultural contracting machine over flat and sloping terrain.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Level 3

Install an agricultural or horticultural water reticulation system
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 3 This unit standard replaced unit standard 6262.

19563 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select equipment, machinery, and materials for the installation operation; install the water reticulation system; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Install an agricultural or horticultural irrigation system
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 3 This unit standard replaced unit standard 6263.

19564 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select equipment, machinery, and materials for installing the irrigation system; install the irrigation system; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate a wheel tractor for agricultural contracting without supervision
This standard has expired and is no longer available.

Version 3 This unit standard and unit standard 19562 have been replaced by unit standard 28780.

19574 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of wheel tractors; carry out pre-operational checks for operating a wheel tractor for agricultural contracting; operate a wheel tractor for agricultural contracting; carry out post-operational procedures; and drive a wheel tractor on the road.

Standard-setting body:

Connexis Infrastructure ITO

Carry out multi-vehicle agricultural contracting operations on roads
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 3

19576 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

This unit standard is for people who drive and operate vehicles during multi-vehicle agricultural contracting operations on roads, but who may not necessarily have a designated traffic management role. People credited with this unit standard are able to: demonstrate basic knowledge of mobile traffic operations; communicate during mobile traffic operations for agricultural contracting; drive a pilot or shadow vehicle during mobile operations for agricultural contracting; and operate a working vehicle during mobile operations for agricultural contracting.

Standard-setting body:

Connexis Infrastructure ITO

Perform measurements and calculations for rural contracting

Word  PDF

Version 4

19577 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to perform measurements and calculations for rural contracting.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Demonstrate knowledge of vehicles and loads in the agricultural contracting industry
This standard has expired and is no longer available.

Version 3

19579 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

This unit standard is for people working in the agricultural contracting industry. People credited with this unit standard are able to: describe vehicles used in the agricultural contracting industry and loads carried by agricultural contractors; and demonstrate knowledge of safe driving of agricultural contracting vehicles.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Produce and confirm a plan to carry out a basic agricultural contracting operation
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 2

23622 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: assess requirements for a basic agricultural contracting operation; produce a plan to carry out the operation; and confirm the plan to carry out the operation.

Standard-setting body:

Connexis Infrastructure ITO

Operate a mulching machine for rural contracting

Word  PDF

Version 3

23623 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare machine for mulching; assess the land and prepare for the mulching operation; carry out the mulching operation; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Transport harvested product to storage

Word  PDF

Version 3

23625 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare for harvesting operations; drive a vehicle to receive loads from a mobile harvester; drive the loads to storage and unload; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate tedders and/or rakes

Word  PDF

Version 3

23629 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: clarify job instructions; select and prepare tedding and/or raking equipment and machinery; carry out field preparation; operate tedders and/or rakes; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a conventional or large square baler for silage or hay
This standard has expired and is no longer available.

Version 2 This unit standard and unit standard 23631 have been replaced by unit standard 28785.

23630 Unit Standard 18 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare conventional or large square baling equipment and machinery; carry out field preparation; operate a conventional or large square baler for silage or hay; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate a round baler for silage or hay
This standard has expired and is no longer available.

Version 2 This unit standard and unit standard 23630 have been replaced by unit standard 28785.

23631 Unit Standard 18 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare round baling equipment and machinery; carry out field preparation; operate a round baler for silage or hay; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate machinery to handle bales for agricultural contracting
This standard has expired and is no longer available.

Version 2 This unit standard and unit standard 6286 have been replaced by unit standard 28784.

23632 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: describe hazard control for hazards associated with operating a machine to handle bales; check and prepare machinery to handle bales; operate machinery to handle bales; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate a bale wrapper

Word  PDF

Version 3

23633 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: carry out initial preparation for bale wrapping; carry out field preparation; operate a bale wrapper; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Demonstrate knowledge of anaerobic silage processes prior to harvesting

Word  PDF

Version 3

23635 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of anaerobic silage processes prior to harvesting.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Prepare for, and carry out, mould-board type ploughing

Word  PDF

Version 3

23638 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: describe mould-board type ploughing; clarify job instructions; select and prepare equipment and machinery; prepare to cultivate soil using a mould-board type plough; cultivate soil using a mould-board type plough; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Store bulk grain or seed delivered from harvest

Word  PDF

Version 3

23639 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare to receive bulk grain or seed delivered from harvest; store bulk grain or seed delivered from harvest; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a tractor for rural contracting operations

Word  PDF

Version 2 This unit standard replaced unit standard 19574 and unit standard 19562.

28780 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: carry out pre-operational checks for operating a tractor and equipment for rural contracting; drive a tractor on the road; operate a tractor with equipment for rural contracting; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Cultivate soil using cultivation equipment

Word  PDF

Version 2 This unit standard replaced unit standard 6269, unit standard 6270 and unit standard 6275.

28781 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: clarify job instructions; select and prepare cultivation equipment and machinery; carry out field preparation; cultivate soil using cultivation equipment; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Apply fertiliser to pasture and crops

Word  PDF

Version 2 This unit standard replaced unit standard 6266.

28782 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: clarify job instructions; select and prepare fertiliser application equipment and machinery; carry out field preparation; apply fertiliser to pasture and crops; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate machinery to handle and store bales

Word  PDF

Version 2 This unit standard replaced unit standard 6286 and unit standard 23632.

28784 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: describe hazard control for hazards associated with operating machinery to handle and store bales; select and prepare bale storing equipment and machinery; prepare to store bales; operate machinery to handle bales; handle and store bales; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a baler for silage or hay

Word  PDF

Version 2 This unit standard replaced unit standard 23630 and unit standard 23631.

28785 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: confirm job instructions; select and prepare baling equipment and machinery; carry out field preparation; operate a baler for silage or hay; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Demonstrate knowledge of environmental protection for rural contracting

Word  PDF

Version 1

32775 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of environmental protection for rural contracting.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Drive a wheel tractor towing a heavy load

Word  PDF

Version 9

6255 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: describe hazard control for hazards associated with driving a wheel tractor towing a heavy load; prepare the wheel tractor and trailer for driving; drive a wheel tractor towing a heavy load over flat and sloping terrain; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a mounted front end loader unit for agricultural contracting
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 7

6257 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: describe hazard control for hazards associated with operating a mounted front end loader unit for agricultural contracting; check and prepare front end loader and mounted front end loader unit before use; operate mounted front end loader unit for agricultural contracting; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Drive a wheel tractor on the road with attached implements
This standard has expired and is no longer available.

Version 6

6258 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: recognise hazards associated with operating a wheel tractor on the road with attached implements; check wheel tractor and implements before use; and drive a wheel tractor safely on the road with attached implements.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Spread effluent on the land by tanker and/or muck spreader
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 6

6267 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare effluent spreading equipment and machinery; carry out field preparation; spread effluent on the land; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Demonstrate knowledge of crop production for rural contracting work

Word  PDF

Version 7

6273 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of seedbed preparation, crop sowing, and crop growth conditions and maturity.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Prepare and harvest hay
This standard has expired and is no longer available.

Version 6

6285 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare hay harvesting equipment and machinery; prepare to harvest hay crop; mow hay crop; ted and bale hay crop; and maintain hay harvesting equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Store hay and/or straw bales
This standard has expired and is no longer available.

Version 6 This unit standard and unit standard 23632 have been replaced by unit standard 28784.

6286 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare hay and/or straw bale storing equipment and machinery; prepare to store hay and/or straw bales; store hay and/or straw bales; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Carry out landscape maintenance for agricultural contracting

Word  PDF

Version 6

6290 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare equipment and machinery for landscape maintenance; maintain lawns and roadside verges; cultivate and fertilise gardens and control weeds; maintain trees, shrubs, and hedges; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Level 4

Operate a tracked tractor and equipment for agricultural contracting
This standard has expired and is no longer available.

Version 3 This unit standard and unit standard 19574 have been replaced by unit standard 28780.

19562 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of tracked tractors and attachments for agricultural contracting; identify hazards and describe safety procedures for operating a tracked tractor for agricultural contracting; prepare the tracked tractor for use in agricultural contracting; carry out field preparation; operate the tracked tractor for land development; carry out post-operational procedures; and move the tracked tractor from site to site.

Standard-setting body:

Connexis Infrastructure ITO

Use a roller crusher for land development
This standard has expired and is no longer available.

Version 3

19565 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

This unit standard is for people who are already competent at driving a bulldozer and who operate one for developing land. People credited with this unit standard are able to: select and prepare equipment and machinery; prepare to develop land using a roller crusher; develop land using a roller crusher; and maintain roller crusher equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Use a rootrake for land development
This standard has expired and is no longer available.

Version 3

19566 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare rootraking equipment and machinery; prepare to develop land using a rootrake; develop land using a rootrake; and maintain rootraking equipment and machinery after use.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Remove stumps for land development
This standard has expired and is no longer available.

Version 3

19567 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare stump removal equipment and machinery; prepare for stump removal; remove stumps; and maintain stump removal equipment and machinery after use.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Cultivate soil using minimum tillage and sow seed
This standard has expired and is no longer available.

Version 3

19568 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare minimum tillage equipment; prepare for minimum tillage; cultivate soil and sow seed; and maintain minimum tillage equipment.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Sow seed for crops

Word  PDF

Version 4

19569 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: confirm job instructions; select and prepare equipment and machinery for sowing crops; carry out field preparation; sow seed for crops; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a mower for rural contracting

Word  PDF

Version 4

19570 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare mowing equipment and machinery; carry out field preparation; operate a mower to mow crops and roadside vegetation; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a hydraulic arm mower on hedges and verges

Word  PDF

Version 4

19571 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare cutting equipment and machinery; prepare for trimming or mowing; trim hedge using a hydraulic arm mower; mow verge using a hydraulic arm mower; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Prepare and harvest cereal silage
This standard has expired and is no longer available.

Version 3

19572 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare cereal silage equipment and machinery; prepare to harvest cereal silage crop; harvest and stack cereal silage crop; and maintain cereal silage equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Operate a hydraulic excavator for agricultural contracting
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 3

19575 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of hydraulic excavators and attachments; prepare for hydraulic excavator operations; manoeuvre and control excavator on an agricultural contracting site; load, mix, and place materials on an agricultural contracting site with a hydraulic excavator; scrape, excavate, and strip a site for land development with a hydraulic excavator; use a hydraulic excavator for land drainage works and trenching; handle rock, non-earth materials, and silage with a hydraulic excavator; carry out post-operational procedures; and move a hydraulic excavator from site to site.

Standard-setting body:

Connexis Infrastructure ITO

Demonstrate use of survey equipment for agricultural contracting land development
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 2

23621 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to prepare the survey equipment for use, and demonstrate use of the survey equipment for agricultural contracting land development.

Standard-setting body:

Connexis Infrastructure ITO

Operate a mobile weighbridge for agricultural contracting
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 2

23624 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: transport and set up weighbridge; carry out weighing operations with the weighbridge; and pack up and transport the weighbridge.

Standard-setting body:

Connexis Infrastructure ITO

Operate a loader wagon for silage harvesting
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 2

23626 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare for harvesting operations; operate the loader wagon to harvest silage; convey the loads to stacks and unload; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate a forage harvester
This standard has expired and is no longer available.

Version 2 This unit standard and unit standard 6277 have been replaced by unit standard 28783.

23634 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare the forage harvester for harvesting; carry out field preparation; carry out harvesting with the forage harvester; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate stacking equipment and machinery for silage production

Word  PDF

Version 3

23636 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: clarify job instructions; select and prepare equipment and machinery for silage stacking; carry out field preparation; build silage stacks with stacking equipment and machinery; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a harvester

Word  PDF

Version 2 This unit standard replaced unit standard 6277 and unit standard 23634.

28783 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: clarify job instructions; select and prepare the harvester for harvesting; carry out field preparation; carry out harvesting with a harvester; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Plan and install an open drain system for rural land drainage
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 6

6260 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan the open drain system for rural land; select and prepare equipment and machinery for open drain system; install an open drain rural land drain system; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Plan and install an underground drain system for rural land drainage
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 6

6261 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

people credited with this unit standard are able to: plan the underground drain system for rural land; select and prepare equipment, machinery, and materials for underground drain system; install an underground rural land drain system; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Thin shelter belts and/or plantations

Word  PDF

Version 7

6264 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare thinning equipment and machinery; carry out field preparation; thin shelter belts and/or plantations; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Trim and limb shelter belts
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 6

6265 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare trimming and limbing equipment and machinery; carry out field preparation; trim shelter belt; limb shelter belt; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Apply fertiliser to pasture and crops
This standard has expired and is no longer available.

Version 6 This unit standard has been replaced by unit standard 28782.

6266 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of fertilisers and their application; select and prepare fertiliser application equipment and machinery; carry out field preparation; apply fertiliser to pasture and crops; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Cultivate soil using a mould-board plough
This standard has expired and is no longer available.

Version 6 This unit standard and unit standard 6280 have been replaced by unit standard 23638.

6268 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of ploughing; select and prepare equipment and machinery; prepare to plough; cultivate soil using a plough; and maintain equipment and machinery after use.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Cultivate soil using a power take off driven cultivator
This standard has expired and is no longer available.

Version 6 This unit standard, unit standard 6270, and unit standard 6275 have been replaced by unit standard 28781.

6269 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare cultivating equipment and machinery; carry out field preparation; cultivate soil using power take off driven cultivation equipment; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Cultivate soil using disc and/or tine cultivation equipment
This standard has expired and is no longer available.

Version 6 This unit standard, unit standard 6269, and unit standard 6275 have been replaced by unit standard 28781.

6270 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare cultivation equipment and machinery; carry out field preparation; cultivate soil using disc and/or tine equipment; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Prepare seedbed on ploughed land
This standard has expired and is no longer available.

Version 6

6271 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of seedbed preparation; select and prepare equipment and machinery for seedbed preparation; prepare to carry out seedbed preparation; prepare seedbed on ploughed land; and maintain power-driven cultivation equipment and machinery after use.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Prepare seedbed on cultivated land
This standard has expired and is no longer available.

Version 6

6272 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: demonstrate knowledge of seedbed preparation; select and prepare equipment and machinery for preparing seedbed on cultivated land; prepare to carry out seedbed preparation; prepare seedbed on cultivated land; and maintain disc or tine cultivation equipment and machinery after use.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Sow pasture crops
This standard has expired and is no longer available.

Version 6

6274 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare equipment and machinery for sowing pasture crops; prepare to sow pasture; sow seed for pasture; and maintain pasture sowing equipment and machinery after use.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Operate a grain and seed drill for agricultural contracting
This standard has expired and is no longer available.

Version 6 This unit standard, unit standard 6269, and unit standard 6270 have been replaced by unit standard 28781.

6275 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare equipment and machinery for sowing grain and seed crops; carry out field preparation; operate the grain and seed drill; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate a precision planter for agricultural contracting

Word  PDF

Version 6

6276 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare tractor and precision planter for sowing seed and/or planting; carry out field preparation; operate the planter; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Operate a combine harvester
This standard has expired and is no longer available.

Version 6 This unit standard and unit standard 23634 have been replaced by unit standard 28783.

6277 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare the combine harvester for harvesting; carry out field preparation; carry out harvesting with the combine harvester; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Operate a root crop harvester

Word  PDF

Version 6

6278 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare root crop harvesting equipment and machinery; carry out field preparation; operate the root crop harvester; and carry out post-operational procedures.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Connexis Infrastructure ITO

Harvest oats and prepare chaff
This standard has expired and is no longer available.

Version 6

6279 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare oat harvesting machinery and equipment; prepare to harvest oat crop; harvest oats and cut chaff; and maintain oat harvesting equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Use a swamp plough for land development
This standard has expired and is no longer available.

Version 6 This unit standard and unit standard 6268 have been replaced by unit standard 23638.

6280 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare swamp equipment and machinery; prepare to plough; develop land using a swamp plough; and maintain swamp ploughing equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Operate heavy chipping and mulching machinery for agricultural contracting
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 6

6283 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: check and prepare heavy chipping and mulching machinery before use; operate the heavy chipping and mulching machinery; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Construct farm tracks and prepare on-farm building sites
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 6

6284 Unit Standard 17 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare track construction equipment and machinery; carry out field preparation to construct farm tracks and on-farm building sites; construct farm tracks and on-farm building sites; and carry out post-operational procedures.

Standard-setting body:

Connexis Infrastructure ITO

Prepare and harvest chopped silage
This standard has expired and is no longer available.

Version 6

6287 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare silage harvesting, transporting, stacking, and compaction equipment and machinery; prepare to harvest silage crop; harvest silage crop; transport and store chopped silage crop; and maintain silage harvesting equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Harvest baled silage
This standard has expired and is no longer available.

Version 6

6288 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare silage harvesting and baling equipment and machinery; prepare to harvest silage crop; harvest silage crop; transport and store silage crop; and maintain silage harvesting and baling equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Harvest maize silage
This standard has expired and is no longer available.

Version 6

6289 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select and prepare maize silage equipment and machinery; prepare to harvest maize silage crop; harvest maize silage crop; transport and store maize silage crop; and maintain maize harvesting equipment and machinery.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Level 5

Manage health and safety for an agricultural contracting workplace
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 3 This unit standard replaced unit standard 6248.

19561 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: develop or review a health and safety plan for an agricultural contracting workplace; implement the health and safety plan; account for accidents, near hits, and serious harm in the agricultural contracting workplace; and develop an emergency action plan for the agricultural contracting workplace.

Standard-setting body:

Connexis Infrastructure ITO

Plan the acquisition of plant for agricultural contracting
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 2 This unit standard replaced unit standard 6249 and unit standard 6291.

23627 Unit Standard 9 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to determine rural contracting plant to acquire, and determine optimal acquisition arrangement and produce required financial details.

Standard-setting body:

Connexis Infrastructure ITO

Prepare a purchasing plan for agricultural contracting equipment
This standard has expired and is no longer available.

Version 6 This unit standard and unit standard 6249 have been replaced by unit standard 23627.

6291 Unit Standard 9 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: define agricultural contracting equipment requirements; source information; and prepare the purchasing plan for agricultural contracting equipment.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Level 6

Plan, price, and manage agricultural contracting work
This standard is expiring. The last date for assessment to take place is 31 December 2021.

Word  PDF

Version 2 This unit standard replaced unit standard 6292 and unit standard 6293.

23628 Unit Standard 30 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: assess requirements for agricultural contracting work; develop the agricultural contracting work programme; price the agricultural contracting work; manage on-site preparation for the agricultural work programme; manage the agricultural work programme; manage care of the machinery and equipment; and manage reporting requirements.

Standard-setting body:

Connexis Infrastructure ITO

Plan and price agricultural contracting work
This standard has expired and is no longer available.

Version 6 This unit standard and unit standard 6293 have been replaced by unit standard 23628.

6292 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: assess client's requirements; plan the agricultural contracting programme; and price agricultural contracting work.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Manage the implementation of agricultural contracting work
This standard has expired and is no longer available.

Version 6 This unit standard and unit standard 6292 have been replaced by unit standard 23628.

6293 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: assess requirements for agricultural contracting work; manage the selection and preparation of agricultural contracting machinery and equipment; plan and timetable the work; and manage agricultural contracting work.

Standard-setting body:

Infrastructure ITO - InfraTrain Connexis Infrastructure ITO

Data as at 21 September 2021