Domain - Structural Foundations
All unit standards registered on the Directory of Assessment Standards may be accessed here.
TOP > Engineering and Technology > Infrastructure Works > Structural Foundations
| 0 Qualifications | 16 Assessment Standards (16 Units) | View Education Organisations with Consent to Assess |
Qualifications
No qualifications currently registered at this level. Also check fields and sub-fields.
Assessment Standards
Show education organisations, CMR & purpose »
| Level 3 | ||||||
| 30808 | Unit |
Prepare and operate plant and confirm post operational procedures |
20 Credits | |||
| 31248 | Unit |
Demonstrate knowledge of and carry out structural foundation site operations |
15 Credits | |||
| 31249 | Unit |
Describe soil properties for structural foundation works |
3 Credits | |||
| Level 4 | ||||||
| 30809 | Unit |
Support and mentor a team on a worksite |
10 Credits | |||
| 30912 | Unit |
Prepare for and complete procedures for onsite piling and deep foundation works |
20 Credits | |||
| 30913 | Unit |
Implement work plans for onsite piling and deep foundation works |
20 Credits | |||
| 30914 | Unit |
Confirm and monitor onsite piling and deep foundation works |
25 Credits | |||
| 30915 | Unit |
Explain, monitor, and review piling equipment operations for onsite piling and deep foundation works |
25 Credits | |||
| 31246 | Unit |
Install bored piles for onsite piling and deep foundation works |
15 Credits | |||
| 31247 | Unit |
Install driven piles for onsite piling and deep foundation works |
15 Credits | |||
| 33278 | Unit |
Prepare for and install anchors for onsite piling and deep foundation works |
15 Credits | |||
| 33279 | Unit |
Prepare for and install sheet piles for onsite piling and deep foundation works |
15 Credits | |||
| 33280 | Unit |
Prepare for and install continuous flight auger piles for onsite piling and deep foundation works |
15 Credits | |||
| 33281 | Unit |
Assess and monitor ground conditions for onsite piling and deep foundation works |
10 Credits | |||
| 33282 | Unit |
Prepare, use, and carry out maintenance on a fixed mast drill rig for onsite piling and deep foundation works |
20 Credits | |||
| 33283 | Unit |
Prepare, use, and carry out maintenance on a pendulum drill rig for onsite piling and deep foundation works |
20 Credits | |||

