Domain - Infrastructure Works Utilities
TOP > Engineering and Technology > Infrastructure Works > Infrastructure Works Utilities
0 Qualifications | 11 Assessment Standards (11 Units) | View Education Organisations with Consent to Assess |
Qualifications Domain-full
No qualifications currently registered at this level. Also check fields and sub-fields.
Assessment Standards
Hide education organisations, CMR & purpose »
Level 3
Operate the drill rig for horizontal directional drilling
Version 4
20484 Unit Standard 20 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: care for and carry out scheduled maintenance on horizontal directional drilling equipment; set up for the pilot bore; carry out the pilot bore; assist with changeover from pilot bore to back ream; back ream and pull through the pipe; and pack up the drilling equipment and carry out daily maintenance.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Clean and maintain a pump station
This standard has expired and is no longer available.
Version 2
28723 Unit Standard 5 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to clean a well and its external components; and perform routine maintenance, and monitor and report on the condition a pump station.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Level 4
Prepare for horizontal directional drilling operations and disestablish the site afterwards
This standard has expired and is no longer available.
Version 4
20480 Unit Standard 6 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: prepare and check the site for horizontal directional drilling operations; set up equipment and materials for the pilot bore and installation tasks; and disestablish the site after completing horizontal directional drilling operations.
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Provide tracking for horizontal directional drilling
Version 4
20485 Unit Standard 20 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: prepare tracking and communications equipment and verify intended bore path; guide pilot bores; and assist with product installation and record as-built data.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Confirm alignment and reinstate pipes and structures to correct line and level
Version 2
28722 Unit Standard 4 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: confirm the alignment of existing pipes and structures; and reinstate non-aligned pipes and structures to the correct line and level.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Carry out pipeline construction or maintenance preparation and service location
Version 1
31515 Unit Standard 5 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to carry out preparation for pipeline construction or maintenance works, and locate and identify services for pipeline construction or maintenance.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Carry out excavation and post-excavation reinstatement work for pipeline construction or maintenance
Version 1
31516 Unit Standard 10 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to: prepare to carry out excavation work; carry out excavation work; and carry out post-excavation reinstatement, for pipeline construction or maintenance.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Demonstrate knowledge of and select pipes and fittings for pipeline construction and maintenance
Version 1 This unit standard replaced unit standard 23278.
31517 Unit Standard 5 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to demonstrate knowledge of: pipes; fittings, support structures and components; and, select pipes and fittings, for pipeline construction and maintenance.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Demonstrate knowledge of and select methods for pipeline construction and maintenance
Version 1 This unit standard replaced unit standard 22103 and unit standard 24918.
31518 Unit Standard 10 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to demonstrate knowledge of: trenched and trenchless methodologies and dewatering and sediment control for pipeline construction and maintenance; monitoring of asset condition for pipeline maintenance; and, select pipeline construction or maintenance methods.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Install pipes for infrastructure pipelaying
Version 1 This unit standard replaced unit standard 27327.
31523 Unit Standard 11 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to prepare to install, and install, pipes for infrastructure pipelaying.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Carry out rubber ring jointing on pipes for infrastructure works
Version 1
31531 Unit Standard 6 Credits
View Education Organisations with Consent to Assess »
People credited with this unit standard are able to prepare to carry out and carry out rubber ring jointing on pipes for infrastructure works.
Consent & Moderation Requirements:
Standard-setting body:
Waihanga Ara Rau Construction and Infrastructure Workforce Development Council
Data as at 2025-05-01 23:01:07.45