Domain - Infrastructure Works Utilities

Domain - Infrastructure Works Utilities

Search Standards

All unit standards registered on the Directory of Assessment Standards may be accessed here. 

TOP > Engineering and Technology > Infrastructure Works > Infrastructure Works Utilities

Qualifications Domain-full

No qualifications currently registered at this level. Also check fields and sub-fields.

Assessment Standards

Hide education organisations, CMR & purpose  »

Level 3

Operate the drill rig for horizontal directional drilling

Word  PDF

Version 4

20484 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: care for and carry out scheduled maintenance on horizontal directional drilling equipment; set up for the pilot bore; carry out the pilot bore; assist with changeover from pilot bore to back ream; back ream and pull through the pipe; and pack up the drilling equipment and carry out daily maintenance.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Clean and maintain a pump station
This standard has expired and is no longer available.

Version 2

28723 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to clean a well and its external components; and perform routine maintenance, and monitor and report on the condition a pump station.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Level 4

Prepare for horizontal directional drilling operations and disestablish the site afterwards
This standard has expired and is no longer available.

Version 4

20480 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare and check the site for horizontal directional drilling operations; set up equipment and materials for the pilot bore and installation tasks; and disestablish the site after completing horizontal directional drilling operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Provide tracking for horizontal directional drilling

Word  PDF

Version 4

20485 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare tracking and communications equipment and verify intended bore path; guide pilot bores; and assist with product installation and record as-built data.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Confirm alignment and reinstate pipes and structures to correct line and level

Word  PDF

Version 2

28722 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: confirm the alignment of existing pipes and structures; and reinstate non-aligned pipes and structures to the correct line and level.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Carry out pipeline construction or maintenance preparation and service location

Word  PDF

Version 1

31515 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to carry out preparation for pipeline construction or maintenance works, and locate and identify services for pipeline construction or maintenance.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Carry out excavation and post-excavation reinstatement work for pipeline construction or maintenance

Word  PDF

Version 1

31516 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare to carry out excavation work; carry out excavation work; and carry out post-excavation reinstatement, for pipeline construction or maintenance.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of and select pipes and fittings for pipeline construction and maintenance

Word  PDF

Version 1 This unit standard replaced unit standard 23278.

31517 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of: pipes; fittings, support structures and components; and, select pipes and fittings, for pipeline construction and maintenance.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of and select methods for pipeline construction and maintenance

Word  PDF

Version 1 This unit standard replaced unit standard 22103 and unit standard 24918.

31518 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of: trenched and trenchless methodologies and dewatering and sediment control for pipeline construction and maintenance; monitoring of asset condition for pipeline maintenance; and, select pipeline construction or maintenance methods.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Install pipes for infrastructure pipelaying

Word  PDF

Version 1 This unit standard replaced unit standard 27327.

31523 Unit Standard 11 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to prepare to install, and install, pipes for infrastructure pipelaying.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Carry out rubber ring jointing on pipes for infrastructure works

Word  PDF

Version 1

31531 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to prepare to carry out and carry out rubber ring jointing on pipes for infrastructure works.

Consent & Moderation Requirements:

CMR 101 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Data as at 2024-04-25 23:01:13.2