Domain - Electricity Supply - Live Work

Domain - Electricity Supply - Live Work

Search Standards

All unit standards registered on the Directory of Assessment Standards may be accessed here. 

TOP > Engineering and Technology > Electricity Supply > Electricity Supply - Live Work

Qualifications Domain-full

No qualifications currently registered at this level. Also check fields and sub-fields.

Assessment Standards

Hide education organisations, CMR & purpose  »

Level 3

Carry out short-term inspections of electricity network structures up to line voltage live line MAD
This standard has expired and is no longer available.

Version 4

17570 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: identify electricity network systems; carry out pre-climbing safety checks on electricity network structures; select electricity network structure climbing equipment; use electricity network structure climbing equipment; carry out above ground inspection on electricity network structures; and document inspection on electricity network structures up to live line MAD.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Prepare working zone for applying protective coatings to tower steel within MAD
This standard has expired and is no longer available.

Version 3

17572 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: determine condition of steel in work area and the surface protection to be applied; establish work sites; wash insulators on electricity structures; move jumpers and insulator strings on electricity structures; and document protective coating work on electricity structures.

Standard-setting body:

Te Pūkenga - New Zealand Institute of Skills and Technology

Level 4

Remove and install line hardware and equipment on structures using live line hot stick up to 66kV

Word  PDF

Version 6

10531 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to remove and install line hardware and equipment using live line hot stick up to 66kV.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Remove and install hardware on termination towers using hot sticks greater than 110kV
This standard has expired and is no longer available.

Version 5

10532 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line hot stick work greater than 110kV on termination towers; displace and reinstate conductors on termination towers using live line hot sticks greater than 110kV; replace tower components on termination towers using live line hot sticks greater than 110kV; and report work on the removal and installation of termination tower hardware on pole structures using live line hot sticks greater than 110kV.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Remove and install line hardware on angle towers using live line hot sticks greater than 110kV
This standard has expired and is no longer available.

Version 5

10533 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line hot stick work greater than 110kV on angle towers; displace and reinstate conductors on angle towers using live line hot sticks greater than 110kV; replace tower components on angle towers using live line hot sticks greater than 110kV; and report work on the removal and installation of angle tower hardware on pole structures using live line hot sticks greater than 110kV.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Remove and install line hardware on suspension towers using live line hot sticks greater than 110kV
This standard has expired and is no longer available.

Version 5

10534 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line hot stick work greater than 110kV on suspension towers; displace and reinstate conductors on suspension towers using live line hot sticks greater than 110kV; replace tower components on suspension towers using live line hot sticks greater than 110kV; and report work on the removal and installation of suspension tower hardware on pole structures using live line hot sticks greater than 110kV.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Remove and install electricity network pole structures using live line hot stick up to 66kV

Word  PDF

Version 6

10535 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to remove and install electricity network pole structures using live line hot stick up to 66kV.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Make and break high voltage connections up to 33kV using live line hot stick procedures

Word  PDF

Version 6

10536 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to make and break high voltage connections up to 33kV using live line hot stick procedures.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Make and break high voltage connections up to 33kV using live line glove and barrier procedures

Word  PDF

Version 6

10537 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to make and break high voltage connections up to 33kV using live line glove and barrier procedures.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Inspect, test, and clean live line tools and equipment

Word  PDF

Version 6

10538 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to inspect, clean, and test live line tools and equipment.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Access electricity supply lines for bare-hand live line work
This standard has expired and is no longer available.

Version 5

10539 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare to access electricity supply lines for bare-hand live line work; identify equipment for access method to be used, complete final access planning, and prepare tools; install and use tooling and rigging on structure to access conductor; and access live line conductors.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of live line theory and procedures

Word  PDF

Version 7

10542 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of: live line theory, techniques, practices and asset owner approval; and how to take out live work permits.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Repair and replace mid-span joints on live electricity network transmission lines
This standard has expired and is no longer available.

Version 3

17571 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: analyse mid-span conductor condition and prepare to repair and replace mid-span conductors; establish mid-span conductor work site; repair and replace mid-span conductors; and document mid-span conductor work.

Standard-setting body:

Te Pūkenga - New Zealand Institute of Skills and Technology

Remove and install electricity network hardware on termination towers using bare hand above 50kV
This standard has expired and is no longer available.

Version 3

18034 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line bare hand work greater than 50kV on termination towers; displace and reinstate conductors above 50kV on termination towers using bare hand; replace tower components on termination towers above 50kV using bare hand; and report work on the removal and installation of electricity network hardware on termination towers using bare hand above 50kV.

Standard-setting body:

Te Pūkenga - New Zealand Institute of Skills and Technology

Remove and install electricity network hardware on angle towers using bare hand greater than 50kV
This standard has expired and is no longer available.

Version 3

18035 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line bare hand work greater than 50kV on angle towers; displace and reinstate conductors above 50kV on angle towers using bare hand; replace tower components on angle towers above 50kV using bare hand; and report work on the removal and installation of electricity network hardware on termination towers using bare hand above 50kV.

Standard-setting body:

Te Pūkenga - New Zealand Institute of Skills and Technology

Remove and install electricity network hardware on suspension towers using bare hand above 50kV
This standard has expired and is no longer available.

Version 3

18036 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line bare hand work greater than 50kV on suspension towers; displace and reinstate conductors above 50kV on suspension towers using bare hand; replace tower components on suspension towers above 50kV using bare hand; and report work on the removal and installation of electricity network hardware on suspension towers using bare hand above 50kV.

Standard-setting body:

Te Pūkenga - New Zealand Institute of Skills and Technology

Joint live low voltage polymeric insulated power cables in the electricity supply industry

Word  PDF

Version 5

20071 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to joint live low voltage polymeric insulated power cables in the electricity supply industry.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Terminate live low voltage polymeric insulated power cables in the electricity supply industry

Word  PDF

Version 5

20072 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to terminate live low voltage polymeric insulated power cables in the electricity supply industry.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Replace and install hardware on live low voltage structures

Word  PDF

Version 1

31956 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to replace and install hardware on live low voltage structures.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Level 5

Replace and install hardware on structures using live line glove and barrier procedures up to 33kV

Word  PDF

Version 6

10540 Unit Standard 30 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to replace and install hardware on structures using live line glove and barrier procedures up to 33kV.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Remove and install pole structures using live line glove and barrier procedures up to 33kV

Word  PDF

Version 6

10541 Unit Standard 20 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to remove and install pole structures using live line glove and barrier procedures up to 33kV.

Consent & Moderation Requirements:

CMR 120 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Install non load bearing accessories on electricity supply conductors using hot stick techniques
This standard has expired and is no longer available.

Version 3

20083 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line hot stick work on electricity supply transmission lines; install non load bearing accessories on electricity supply conductors using hot stick live line techniques; and report work on the installation of non load bearing accessories.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Displace jumpers and suspension strings on electricity supply transmission lines using hot stick techniques
This standard has expired and is no longer available.

Version 3

20084 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare to push out jumpers and suspension strings using live line hot stick techniques on electricity supply transmission lines; displace conductors on suspension strings; and report displacement work.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Install non load bearing accessories on electricity supply conductors using bare-hand techniques
This standard has expired and is no longer available.

Version 3

20085 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for live line bare-hand work on electricity supply transmission lines; install non load bearing accessories on electricity supply conductors using bare-hand live line techniques; and report work on the installation of non load bearing accessories.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Replace suspension insulators on electricity supply structures using live line bare-hand techniques
This standard has expired and is no longer available.

Version 3

20086 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for replacement of suspension insulators using live line bare-hand methods; replace suspension insulators using live line bare-hand techniques; and report work on the replacement of suspension insulators.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Replace tension insulators on electricity supply structures using live line bare-hand techniques
This standard has expired and is no longer available.

Version 3

20087 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare for replacement of tension insulators using live line bare-hand techniques; replace tension insulators on electricity supply structures using live line bare-hand techniques; report work on the replacement of tension insulators.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Replace electricity supply structures and cross arms using live work techniques
This standard has expired and is no longer available.

Version 2

20088 Unit Standard 12 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan and prepare to replace electricity supply structures and cross arms using live work techniques; establish work site to replace electricity supply structures and cross arms using live work techniques; replace electricity supply structures and cross arms using live work techniques; reinstate work site; and report structure and cross arm replacement work in accordance with industry requirements.

Standard-setting body:

Te Pūkenga - New Zealand Institute of Skills and Technology

Use a conductor trolley on live electricity supply conductors
This standard has expired and is no longer available.

Version 2

20089 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: plan the use of a conductor trolley in a live environment; place and remove trolley; pass trolley through or around suspension insulator; and report work on use of conductor trolleys on live conductors in accordance with industry requirements.

Standard-setting body:

Te Pūkenga - New Zealand Institute of Skills and Technology

Data as at 2024-04-19 23:01:07.723