Domain - Electricity Supply - Live Work
All unit standards registered on the Directory of Assessment Standards may be accessed here.
TOP > Engineering and Technology > Electricity Supply > Electricity Supply - Live Work
0 Qualifications | 28 Assessment Standards (28 Units) | View Education Organisations with Consent to Assess |
Qualifications
No qualifications currently registered at this level. Also check fields and sub-fields.
Assessment Standards
Show education organisations, CMR & purpose »
Level 3 | ||||||
17570 | Unit |
Carry out short-term inspections of electricity network structures up to line voltage live line MAD This standard has expired and is no longer available. |
6 Credits | |||
17572 | Unit |
Prepare working zone for applying protective coatings to tower steel within MAD This standard has expired and is no longer available. |
4 Credits | |||
Level 4 | ||||||
10531 | Unit |
Remove and install line hardware and equipment on structures using live line hot stick up to 66kV |
20 Credits | |||
10532 | Unit |
Remove and install hardware on termination towers using hot sticks greater than 110kV This standard has expired and is no longer available. |
6 Credits | |||
10533 | Unit |
Remove and install line hardware on angle towers using live line hot sticks greater than 110kV This standard has expired and is no longer available. |
6 Credits | |||
10534 | Unit |
Remove and install line hardware on suspension towers using live line hot sticks greater than 110kV This standard has expired and is no longer available. |
6 Credits | |||
10535 | Unit |
Remove and install electricity network pole structures using live line hot stick up to 66kV |
20 Credits | |||
10536 | Unit |
Make and break high voltage connections up to 33kV using live line hot stick procedures |
10 Credits | |||
10537 | Unit |
Make and break high voltage connections up to 33kV using live line glove and barrier procedures |
10 Credits | |||
10538 | Unit |
Inspect, test, and clean live line tools and equipment |
6 Credits | |||
10539 | Unit |
Access electricity supply lines for bare-hand live line work This standard has expired and is no longer available. |
4 Credits | |||
10542 | Unit |
Demonstrate knowledge of live line theory and procedures |
10 Credits | |||
17571 | Unit |
Repair and replace mid-span joints on live electricity network transmission lines This standard has expired and is no longer available. |
12 Credits | |||
18034 | Unit |
Remove and install electricity network hardware on termination towers using bare hand above 50kV This standard has expired and is no longer available. |
6 Credits | |||
18035 | Unit |
Remove and install electricity network hardware on angle towers using bare hand greater than 50kV This standard has expired and is no longer available. |
6 Credits | |||
18036 | Unit |
Remove and install electricity network hardware on suspension towers using bare hand above 50kV This standard has expired and is no longer available. |
6 Credits | |||
20071 | Unit |
Joint live low voltage polymeric insulated power cables in the electricity supply industry |
10 Credits | |||
20072 | Unit |
Terminate live low voltage polymeric insulated power cables in the electricity supply industry |
10 Credits | |||
31956 | Unit |
Replace and install hardware on live low voltage structures |
10 Credits | |||
Level 5 | ||||||
10540 | Unit |
Replace and install hardware on structures using live line glove and barrier procedures up to 33kV |
30 Credits | |||
10541 | Unit |
Remove and install pole structures using live line glove and barrier procedures up to 33kV |
20 Credits | |||
20083 | Unit |
Install non load bearing accessories on electricity supply conductors using hot stick techniques This standard has expired and is no longer available. |
6 Credits | |||
20084 | Unit |
Displace jumpers and suspension strings on electricity supply transmission lines using hot stick techniques This standard has expired and is no longer available. |
6 Credits | |||
20085 | Unit |
Install non load bearing accessories on electricity supply conductors using bare-hand techniques This standard has expired and is no longer available. |
10 Credits | |||
20086 | Unit |
Replace suspension insulators on electricity supply structures using live line bare-hand techniques This standard has expired and is no longer available. |
12 Credits | |||
20087 | Unit |
Replace tension insulators on electricity supply structures using live line bare-hand techniques This standard has expired and is no longer available. |
15 Credits | |||
20088 | Unit |
Replace electricity supply structures and cross arms using live work techniques This standard has expired and is no longer available. |
12 Credits | |||
20089 | Unit |
Use a conductor trolley on live electricity supply conductors This standard has expired and is no longer available. |
15 Credits |