Domain - Precast Concrete

Domain - Precast Concrete

Search Standards

All unit standards registered on the Directory of Assessment Standards may be accessed here. 

TOP > Planning and Construction > Concrete > Precast Concrete

Qualifications Domain-full

No qualifications currently registered at this level. Also check fields and sub-fields.

Assessment Standards

Hide education organisations, CMR & purpose  »

Level 3

Coordinate the handling, storage, dispatch and loading of precast concrete units
This standard has expired and is no longer available.

Version 5

12017 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: coordinate the handling of precast concrete units; coordinate the storage of precast concrete units; process orders for delivery of precast concrete units and arrange dispatch; coordinate the loading of precast concrete units; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Place and finish concrete for precasting
This standard has expired and is no longer available.

Version 6

12024 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: place, compact and screed concrete for precasting; apply finish to concrete surfaces; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Assemble and service moulds, and demould products for precast concrete product manufacture
This standard is expiring. The last date for assessment to take place is Tue Dec 31 00:00:00 NZDT 2024.

Word  PDF

Version 2 This unit standard replaced unit standard 12028.

26070 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare to assemble, and assemble moulds for precast concrete product manufacture; prepare to demould, and demould precast concrete products; service moulds for precast concrete product manufacture; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of lifting systems for precast concrete elements
This standard has expired and is no longer available.

Version 2

26071 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of lifting systems for precast concrete elements.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of assembling and servicing moulds, and demoulding, for precast concrete product manufacture
This standard has expired and is no longer available.

Version 2

26072 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of mould components and specifications; assembly of moulds; demoulding; and servicing of moulds, for precast concrete product manufacture.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Use lifting systems for precast concrete elements
This standard has expired and is no longer available.

Version 2

26073 Unit Standard 4 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: select, prepare and use lifting systems for precast concrete elements, and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture precast concrete stairs
This standard has expired and is no longer available.

Version 2

26520 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare, set up moulds and storage areas, carry out the pre-pour process, place and test concrete, and finish concrete; for precast concrete stair manufacture; and cure and demould, lift and store, carry out post-pour checks and remedial work, carry out delivery processes; for precast concrete stairs; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Cut and drill concrete for precast concrete manufacture
This standard has expired and is no longer available.

Version 2

26521 Unit Standard 15 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: undertake routine maintenance of cutting and drilling equipment for precast concrete product manufacture, set up for cutting and drilling concrete in a precast concrete manufacturing yard, cut concrete in a precast concrete manufacturing yard, drill concrete in a precast concrete manufacturing yard, and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of structural prestressed concrete element manufacture
This standard has expired and is no longer available.

Version 2

26522 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of: preparation, setting up moulds and storage areas, the pre-pour process, placing and testing concrete, and finishes for concrete; for structural prestressed concrete element manufacture; and curing, destressing and demoulding, lifting and storing, post-pour checks and remedial work, and delivery processes; for prestressed concrete elements.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of structural precast concrete element manufacture
This standard has expired and is no longer available.

Version 2

26523 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to demonstrate knowledge of: preparation, setting up moulds and storage areas, the pre-pour process, placing and testing concrete, and finishes for concrete; for structural precast concrete element manufacture; and curing and demoulding, lifting and storing, post-pour checks and remedial work, and delivery processes; for structural precast concrete elements.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture precast concrete beams and columns
This standard has expired and is no longer available.

Version 2

26524 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare, set up moulds and storage areas, carry out the pre-pour process, place and test concrete, and finish concrete; for precast concrete beam and column manufacture; and cure and demould, lift and store, carry out post-pour checks and remedial work, carry out delivery processes; for precast concrete beams and columns; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture precast concrete panels
This standard has expired and is no longer available.

Version 2

26525 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare, set up mould and storage area, carry out the pre-pour process, place and test concrete, and finish concrete; for precast concrete panel manufacture; and cure and demould, lift and store, carry out post-pour checks and remedial work, and carry out delivery processes; for precast concrete panels; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture prestressed concrete beams and columns
This standard has expired and is no longer available.

Version 2 This unit standard, unit standard 26527, and unit standard 26528 replaced unit standard 12036.

26526 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare, set up prestressing equipment, moulds and storage areas, carry out the pre-pour process, place and test concrete, and finish concrete; for prestressed concrete beam and column manufacture; and cure, destress and demould, lift and store, carry out post-pour checks and remedial work, and carry out delivery processes; for prestressed concrete beams and columns; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture prestressed concrete flooring units
This standard has expired and is no longer available.

Version 2 This unit standard, unit standard 26526, and unit standard 26528 replaced unit standard 12036.

26527 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare, set up prestressing equipment, moulds and storage areas, carry out the pre-pour process, place and test concrete, and finish concrete; for prestressed concrete flooring unit manufacture; and cure, destress and demould, lift and store, carry out post-pour checks and remedial work, and carry out delivery processes; for prestressed concrete flooring units; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture prestressed concrete panels
This standard has expired and is no longer available.

Version 2 This unit standard, unit standard 26526, and unit standard 26527 replaced unit standard 12036.

26528 Unit Standard 25 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: prepare, set up prestressing equipment, moulds and storage areas, carry out the pre-pour process, place and test concrete, and finish concrete; for prestressed concrete panel manufacture; and cure, destress and demould, lift and store, carry out post-pour checks and remedial work, and carry out delivery processes; for prestressed concrete panels; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of precast concrete tank manufacture
This standard has expired and is no longer available.

Version 2

27179 Unit Standard 30 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to, for the manufacture of precast concrete tanks, demonstrate knowledge of: . preparation . setting up moulds . fabricating and placing reinforcing, and the pre-pour process . placing and testing concrete . finishing concrete . curing and demoulding . lifting and storing . finishing, post-pour checks and remedial work . delivery processes.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of traditional concrete tank manufacture
This standard has expired and is no longer available.

Version 2

27180 Unit Standard 40 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to, for the manufacture of traditional concrete tanks, demonstrate knowledge of: . preparation . setting up moulds and frames . fabricating and placing reinforcing, and the pre-pour process . placing and testing plaster and concrete . finishing plaster and concrete . curing and demoulding . lifting and storing . finishing, post-pour checks and remedial work . delivery processes.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture precast concrete tanks
This standard has expired and is no longer available.

Version 2

27181 Unit Standard 30 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to, for the manufacture of precast concrete tanks: . prepare . set up moulds . fabricate and place reinforcing, and carry out the pre-pour process . place and test concrete . finish concrete . cure and demould . lift and store . finish, perform post-pour checks and remedial work . carry out delivery processes . complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Manufacture traditional concrete tanks
This standard has expired and is no longer available.

Version 2

27182 Unit Standard 40 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to, for the manufacture of traditional concrete tanks: . prepare . set up moulds and frames . fabricate and place reinforcing, and carry out the pre-pour process . place and test plaster and concrete . finish plaster and concrete . cure and demould . lift and store . finish, perform post-pour checks and remedial work . carry out delivery processes.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Complete pre-pour processes for precast concrete manufacture

Word  PDF

Version 1

32683 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for those working in the precast concrete manufacturing industry. People credited with this standard are able to complete pre-pour processes for precast concrete manufacture to commercial standards.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Place and finish concrete for precast concrete manufacture

Word  PDF

Version 1

32684 Unit Standard 7 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for those working in precast concrete manufacturing. People credited with this standard are able to place and finish concrete for precast concrete manufacture to commercial standards.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Complete post-pour processes for precast concrete manufacture

Word  PDF

Version 1

32685 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for those working in precast concrete manufacture. People credited with this standard are able to complete post-pour processes for precast concrete manufacture to commercial standards.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Operate and maintain machinery, plant and equipment used to manufacture precast concrete elements

Word  PDF

Version 1

32855 Unit Standard 5 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for those working in precast concrete manufacture. People credited with this standard are able to operate and maintain machinery, plant, and equipment used to manufacture precast concrete elements to commercial standards.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Level 4

Manufacture and fabricate moulds for precast concrete
This standard has expired and is no longer available.

Version 5

12029 Unit Standard 30 Credits

View Education Organisations with Consent to Assess  »

People credited with this unit standard are able to: determine requirements for moulds; manufacture and fabricate moulds for precast concrete; and complete work operations.

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Place and finish concrete components used in the manufacture of ferro-cement tanks

Word  PDF

Version 2

31356 Unit Standard 13 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the ferro-cement tank manufacture industry. People credited with this unit standard are able to place and finish concrete components used in the manufacture of ferro-cement tanks to the level required of a commercially competent ferro-cement tank manufacturer.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of materials, and store and protect materials and products used to manufacture ferro-cement tanks

Word  PDF

Version 2

31357 Unit Standard 6 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the ferro-cement tank manufacture industry. People credited with this unit standard are able to demonstrate knowledge of materials, and store and protect materials and products used to manufacture ferro-cement tanks to the level required of a commercially competent ferro-cement tank manufacturer.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Mix sand and cement plaster for ferro-cement tank manufacture

Word  PDF

Version 2

31358 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the ferro-cement tank manufacture industry. People credited with this unit standard are able to mix sand and cement plaster for ferro-cement tank manufacture to the level required of a commercially competent ferro-cement tank manufacturer.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Plaster ferro-cement tanks

Word  PDF

Version 2

31359 Unit Standard 40 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the ferro-cement tank manufacture industry. People credited with this unit standard are able to plaster ferro-cement tanks to the level required of a commercially competent ferro-cement tank manufacturer.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Prepare to manufacture ferro-cement tanks

Word  PDF

Version 2

31360 Unit Standard 8 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the ferro-cement tank manufacture industry. People credited with this unit standard are able to prepare to manufacture ferro-cement tanks to the level required of a commercially competent ferro-cement tank manufacturer.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Plan and lead a work programme, and quality assure manufacturing for precast concrete

Word  PDF

Version 1

32584 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

This unit standard is for people working in the construction industry. People credited with this standard are able to plan and lead a work programme, and quality assure manufacturing for precast concrete elements to the level of performance required of a commercially competent tradesperson.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Maintain equipment and machinery used in concrete prestressing operations

Word  PDF

Version 1

32601 Unit Standard 7 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the construction industry. People credited with this standard can maintain equipment and machinery used in concrete prestressing operations to the level of performance required of a commercially competent tradesperson.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of materials and components used in concrete prestressing operations

Word  PDF

Version 1

32602 Unit Standard 7 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the construction industry. People credited with this standard can demonstrate knowledge of materials and components used in concrete prestressing operations to the level of performance required of a commercially competent tradesperson.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Plan and carry out concrete prestressing operations

Word  PDF

Version 1

32603 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

This unit standard is intended for people working in the construction industry. People credited with this standard can plan and carry out concrete prestressing operations to the level of performance required of a commercially competent tradesperson.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Demonstrate knowledge of mould design, materials and construction methodology for precast concrete manufacture

Word  PDF

Version 1

32604 Unit Standard 10 Credits

View Education Organisations with Consent to Assess  »

This unit standard is for people working in the construction industry. People credited with this standard can demonstrate knowledge of: mould design, materials, and construction methodology; reinforcing design, materials and steel tying methodology; concrete surface finishes; and rigging lifting and storing precast elements to the level of performance required of a commercially competent tradesperson.

Consent & Moderation Requirements:

CMR 48 Word PDF

Standard-setting body:

Waihanga Ara Rau Construction and Infrastructure Workforce Development Council

Data as at 2024-04-23 23:01:10.73